Choose an ADU type for your parcel
State law (RCW 36.70A.681) requires Bellevue to allow two ADUs on a lot in a single-family zone — one attached and one detached, two attached, or two detached — except on lots with critical areas or their buffers. An address’s own page checks its lot’s zoning.
DADU — Detached
Backyard cottage with its own foundation and roof. Most flexibility on layout.
AADU — Attached
Part of the house or built onto it: a converted basement or garage, or an addition.
Pre-approved plans
Bellevue is putting together a pre-approved plan program for detached ADUs, up to 10 plans; none can be used yet.
Bellevue’s program pageBellevue permit-process facts
ADU permit fees
Set by the Bellevue fee schedule.
Fee scheduleBellevue prices an ADU's building permit on the value of the work: $728.65 for the first $25,000 plus $19.06 for each $1,000 more up to $50,000, $1,205.15 for the first $50,000 plus $12.33 for each $1,000 more up to $100,000, and $1,821.65 for the first $100,000 plus $10.77 for each $1,000 more up to $1,000,000, each prorated. Plan review is 65% of that fee and the operations fee $53 (Ordinance 6879), and the state building code fee is $6.50 on a residential permit (RCW 19.27.085). Land use, utility, transportation and clearing and grading reviews add their own fees by permit type (Ordinance 6879, Tables 13, 20, 22 and 25). The school impact fee on an ADU is half the principal unit's, and the Issaquah and Renton school districts' fees under the ordinance are $0. Bellevue issues its own electrical permits, priced on the value of the electrical work, $79 up to $500. Apply via mybuildingpermit.com.
Review timeline
Typical: 21–90 business days
HB 1337 conformance
Bellevue permits at least two ADUs per single-family lot, with no owner-occupancy requirement and parking limits that respect the HB 1337 ceilings.
These are Bellevue’s ADU rules as Kolmo reads them; an address’s own page adds its setbacks, easements and critical-area buffers. Source: bellevuewa.gov, last verified 2026-08-04.
ADU permits in Bellevue — FAQ
Does Bellevue allow detached ADUs (DADUs)?
Yes. Washington's HB 1337 (RCW 36.70A.681) requires Bellevue to allow at least two accessory dwelling units on a lot in a single-family zone within the urban growth area, attached or detached in any combination, except on lots with critical areas or their buffers.
What is the maximum ADU size in Bellevue?
State law bars a city from setting a maximum ADU size below 1,000 sq ft of gross floor area (RCW 36.70A.681(1)(f)). Bellevue's own maximum may be higher — the per-parcel page shows it with the city's code citation.
How long does ADU permit review take in Bellevue?
Bellevue's ADU permits typically review in 21–90 business days. Pre-approved standard plans (where available) cut this further.
