Side sewer permits in Bellevue: fees, timeline & requirements (2026)

Everything you need to know about pulling a side sewer permit in Bellevue, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Bellevue Development Services.

Look up your Bellevue address

Free lookup, no account needed — your lot lines and the house, with a plan to draw the side sewer, cited to Bellevue's source.

Permit required?
Always
Permit fee
Where Bellevue Utilities serves the lot, a single-family side sewer connection permit is $325 for review plus a $432 inspection deposit; a small repair is $216 for inspection with no review fee (Ordinance 6879, Table 26).
Review timeline
Not published by the city

When does side sewer work need a permit in Bellevue?

Where the City of Bellevue's sewer utility owns the sewer, a side sewer permit is required to construct a side sewer and to make any addition, repair or connection to an existing side sewer (BCC 24.04.120(B)(1)), so any repair counts, with no minimum length. The property owner or their licensed and bonded contractor applies, and the permit expires two years after it is issued. Where a sewer district owns the main, that district issues the permit under its own code, so confirm the owner of the main before applying. WAC 51-56, the state plumbing code, governs how the building sewer is laid.

From Bellevue's own code

“A side sewer permit is required to construct a side sewer and/or to make any additions, repairs or connections to an existing side sewer.”
Source ↗verified 2026-10-24

Required submittals

  • Site plan with sewer line route
  • Depth + slope detail
  • Cleanout locations
  • Utility locate ticket

Inspection sequence

  1. Pre-cover (open trench)
  2. Air / water test
  3. Final

Contractor specialties needed

Side sewer contractor

Who can do this work in Bellevue?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Bellevue and King County. Kolmo prepares the drawings and submittals, files the side sewer permit with Bellevue Development Services, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Bellevue side sewer quote.

Notes & caveats

Issuing body is the sanitary sewer utility, not the building department, and inspection is the utility's too. Some utilities additionally require the contractor to hold a side-sewer card or registration before they will issue; it is not universal, so check the serving utility's own rules rather than assuming either way.

How to apply yourself

  1. 1. Draw the side sewer. Run an address lookup for your side sewer work in Bellevue — we'll pull your lot lines and the house, and you can draw the side sewer's run to the street on a plan of the lot.
  2. 2. Assemble submittals: the 4 documents under Required submittals above.
  3. 3. Submit through the city portal: Bellevue Development Services ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (the sewer utility that serves the lot sets them) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Bellevue Development Services, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Side sewer permits in Bellevue — FAQ

When does side sewer work need a permit in Bellevue?

Where the City of Bellevue's sewer utility owns the sewer, a side sewer permit is required to construct a side sewer and to make any addition, repair or connection to an existing side sewer (BCC 24.04.120(B)(1)), so any repair counts, with no minimum length. The property owner or their licensed and bonded contractor applies, and the permit expires two years after it is issued. Where a sewer district owns the main, that district issues the permit under its own code, so confirm the owner of the main before applying. WAC 51-56, the state plumbing code, governs how the building sewer is laid.

How much does a side sewer permit cost in Bellevue?

Where Bellevue Utilities serves the lot, a single-family side sewer connection permit is $325 for review plus a $432 inspection deposit; a small repair is $216 for inspection with no review fee (Ordinance 6879, Table 26). Apply via https://mybuildingpermit.com.