side sewer permit requirements across 10 verified Seattle-area cities

Side-by-side: which of Seattle, Bellevue, Kirkland, Redmond, Sammamish, Issaquah, Renton, Kent, Federal Way, and Mercer Island require a permit for a side sewer, what triggers one, what it costs, and how long review takes. Verified against each city's own page; sources cited per row.

8 of 10 cities have authoritative rules on file · 8 typically require a permit · 0 often do not.

King County

JurisdictionPermit?ThresholdFeeReview daysSource
City of Bellevue
city
YesSide-sewer permits issued by the local utility (Seattle SPU; King County WTD; per-city utility elsewhere) under 2021 UPC + city utility code. Triggered by new connection, repair >2 ft of pipe, relining (CIPP), or capping at the property line for demolition.Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com.Cite
verified 2026-04-26
City of Federal Way
city
YesSide-sewer permits issued by the local utility (Seattle SPU; King County WTD; per-city utility elsewhere) under 2021 UPC + city utility code. Triggered by new connection, repair >2 ft of pipe, relining (CIPP), or capping at the property line for demolition.Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com. Apply via MyBuildingPermit.com.Cite
verified 2026-04-26
City of Issaquah
city
YesSide-sewer permits issued by the local utility (Seattle SPU; King County WTD; per-city utility elsewhere) under 2021 UPC + city utility code. Triggered by new connection, repair >2 ft of pipe, relining (CIPP), or capping at the property line for demolition.Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com. Apply via MyBuildingPermit.com.Cite
verified 2026-04-26
City of Kent
city
YesSide-sewer permits issued by the local utility (Seattle SPU; King County WTD; per-city utility elsewhere) under 2021 UPC + city utility code. Triggered by new connection, repair >2 ft of pipe, relining (CIPP), or capping at the property line for demolition.Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://kentwa.gov/permits. Kent uses MyKent permits portal.Cite
verified 2026-04-26
City of Kirkland
city
YesSide-sewer permits issued by the local utility (Seattle SPU; King County WTD; per-city utility elsewhere) under 2021 UPC + city utility code. Triggered by new connection, repair >2 ft of pipe, relining (CIPP), or capping at the property line for demolition.Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com. Apply via MyBuildingPermit.com.Cite
verified 2026-04-26
City of Mercer Island
city
Pending verificationPortal
City of Redmond
city
YesSide-sewer permits issued by the local utility (Seattle SPU; King County WTD; per-city utility elsewhere) under 2021 UPC + city utility code. Triggered by new connection, repair >2 ft of pipe, relining (CIPP), or capping at the property line for demolition.Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://eplans.redmond.gov. Redmond uses ePlans portal.Cite
verified 2026-04-26
City of Renton
city
YesSide-sewer permits issued by the local utility (Seattle SPU; King County WTD; per-city utility elsewhere) under 2021 UPC + city utility code. Triggered by new connection, repair >2 ft of pipe, relining (CIPP), or capping at the property line for demolition.Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://permits.rentonwa.gov. Renton uses TRAKiT permits portal.Cite
verified 2026-04-26
City of Sammamish
city
YesSide-sewer permits issued by the local utility (Seattle SPU; King County WTD; per-city utility elsewhere) under 2021 UPC + city utility code. Triggered by new connection, repair >2 ft of pipe, relining (CIPP), or capping at the property line for demolition.Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com. Apply via MyBuildingPermit.com.Cite
verified 2026-04-26
City of Seattle
city
Pending verificationPortal

How this table is built

Each row reflects the most-recently-verified authoritative rule on file for that jurisdiction and project type. “Pending verification” means we have the jurisdiction in our database but haven't yet personally checked the city page for side sewer rules — those rows fall back to county or WA-state baselines until verified. Sources link directly to the city or county page we read on the verified-on date. See our data-quality leaderboard for how we keep these current.