Kitchen remodel permits in City of Everett: fees, timeline & requirements (2026)

Everything you need to know about pulling a kitchen remodel permit in City of Everett, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Everett Planning Department.

Look up your City of Everett address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Everett's source.

Permit required?
Depends on the scope — see below
Permit fee
Fees set by jurisdiction. WA Building Code Council surcharge: $6.50 per building permit. Trade permits separate.
Review timeline
10–21 days

When does a kitchen remodel need a permit in City of Everett?

Cosmetic-only refresh (cabinets, countertops, flooring, paint) without structural/electrical/plumbing changes is generally exempt under 2021 IRC R105.2 (work exempt from permit). Any new circuit, fixture relocation, or structural change requires permits.

How City of Everett adopted this rule

The threshold comes from the state code (WAC 51.51), which City of Everett adopts by reference in the provision quoted below.

“A. Amendments applicable to adopted codes: 1. Any reference to the “Everett building code,” “Everett mechanical code,” “Everett fire code,” “Everett plumbing code,” “Everett electrical code,” and “Everett energy code,” in the Everett Municipal Code or elsewhere, refers to the corresponding code adopted pursuant to Section 16.005.030 . 2. Unless the context requires otherwise, any reference to a code adopted pursuant to Section 16.005.030 refers to that code as adopted herein. 3.”
Source ↗verified 2026-04-26

Required submittals

  • floor plan with fixture locations
  • electrical layout
  • plumbing diagram
  • WSEC compliance form if envelope/lighting affected

Inspection sequence

  1. rough-in (electrical/plumbing/mechanical)
  2. insulation if walls opened
  3. drywall
  4. final

Contractor specialties needed

general, electrical-01-or-02, plumbing

Who can do this work in City of Everett?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Everett and Snohomish County. Kolmo prepares the drawings and submittals, files the kitchen remodel permit with Everett Planning Department, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Everett kitchen remodel quote.

Notes & caveats

2021 IRC R105.1 requires building permits for "construction, enlargement, alteration, repair, movement, removal, conversion, or demolition" except work listed in R105.2. New electrical circuits → electrical permit (WAC 296-46B). New/relocated plumbing fixtures → plumbing permit (UPC, WAC 51-56). New gas line or range hood vent → mechanical permit.

Kitchen remodel permit fee — Washington baseline, not City of Everett's own schedule

Worked example for a $35,000 kitchen remodel project (building permit). Your actual fee scales with project valuation.

Building permit fee$492.25
Plan review$319.96
WA state surcharge$6.5
Estimated total$818.71

Fees set by jurisdiction. WA Building Code Council surcharge: $6.50 per building permit. Trade permits separate. We have not read City of Everett's adopted fee schedule, so this is not City of Everett's fee: it walks the standard valuation table most Washington cities adopt by reference, as a rough guide. The real numbers are in City of Everett's fee schedule ↗. Impact/utility fees may apply separately.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Everett kitchen remodel — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (4).
  3. 3. Submit through the city portal: Everett Planning Department ↗
  4. 4. Track review (typical: 10–21 days). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Fees set by jurisdiction. WA Building Code Council surcharge: $6.50 per building permit. Trade permits separate.) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull kitchen remodel permits in City of Everett every month. We prepare the drawings and submittals, file with Everett Planning Department, handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Kitchen remodel permits in City of Everett — FAQ

When does a kitchen remodel need a permit in City of Everett?

Cosmetic-only refresh (cabinets, countertops, flooring, paint) without structural/electrical/plumbing changes is generally exempt under 2021 IRC R105.2 (work exempt from permit). Any new circuit, fixture relocation, or structural change requires permits.

How much does a kitchen remodel permit cost in City of Everett?

For a $35,000 kitchen remodel project, the estimated City of Everett permit fee is about $818.71 — building fee $492.25 + plan review $319.96 + surcharges. Fees scale with project valuation per the city schedule.

How long does City of Everett take to review a kitchen remodel permit?

Typical review window: 10–21 days.

City of Everett resourcesPermit portal ↗Fee schedule ↗