Side sewer permits in City of Issaquah: fees, timeline & requirements (2026)

Everything you need to know about pulling a side sewer permit in City of Issaquah, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Community Planning & Development.

Look up your City of Issaquah address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Issaquah's source.

Permit required?
Yes — see threshold below
Permit fee
Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com.
Review timeline

When does a side sewer need a permit in City of Issaquah?

The side-sewer permit is issued by whichever utility owns the sanitary sewer — the city, a sewer or water district, or a regional utility — under that utility's own code, with WAC 51-56 (2021 UPC) governing how the building sewer is laid. WHICH UTILITY IS A PER-PROPERTY FACT: a lot can sit inside a city for permitting and outside its sewer district, so confirm the owner of the main before applying. Triggered by a new connection, repair of more than about 2 ft of pipe, relining (CIPP), or capping at the property line for a demolition.

From City of Issaquah's own code

Before any work is started for construction of a side sewer or any modification of an existing side sewer on private property or within public rights-of-way, an application shall be made for a side sewer permit and the permit issued by the City. B. Issuance. No permit will be issued for side sewer construction before the public or private sewer main is accepted by the City.
Source ↗verified 2026-09-06

Required submittals

  • site plan with sewer line route
  • depth + slope detail
  • cleanout locations
  • utility locate ticket

Inspection sequence

  1. pre-cover (open trench)
  2. air / water test
  3. final

Contractor specialties needed

side-sewer-contractor

Who can do this work in City of Issaquah?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Issaquah and King County. Kolmo prepares the drawings and submittals, files the side sewer permit with Community Planning & Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Issaquah side sewer quote.

Notes & caveats

Issuing body is the sanitary sewer utility, NOT the building department, and inspection is the utility's too. SOME utilities additionally require the contractor to hold a side-sewer card or registration before they will issue; it is not universal, so check the serving utility's own rules rather than assuming either way.

Side sewer permit fee estimate in City of Issaquah

Worked example for a $25,000 side sewer project (plumbing permit). Your actual fee scales with project valuation.

Building permit fee$300
Plan review$195
WA state surcharge$6.5
Estimated total$501.5

Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com. Computed from the City of Issaquah fee bracket schedule · source ↗. Impact/utility fees may apply separately.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Issaquah side sewer — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (4).
  3. 3. Submit through the city portal: Community Planning & Development
  4. 4. Track review (typical: ). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Side-sewer permits typically $150-$500; depth-based surcharge in some cities. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com.) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull side sewer permits in City of Issaquah every month. We prepare the drawings and submittals, file with Community Planning & Development, handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Side sewer permits in City of Issaquah — FAQ

When does a side sewer need a permit in City of Issaquah?

The side-sewer permit is issued by whichever utility owns the sanitary sewer — the city, a sewer or water district, or a regional utility — under that utility's own code, with WAC 51-56 (2021 UPC) governing how the building sewer is laid. WHICH UTILITY IS A PER-PROPERTY FACT: a lot can sit inside a city for permitting and outside its sewer district, so confirm the owner of the main before applying. Triggered by a new connection, repair of more than about 2 ft of pipe, relining (CIPP), or capping at the property line for a demolition.

How much does a side sewer permit cost in City of Issaquah?

For a $25,000 side sewer project, the estimated City of Issaquah permit fee is about $501.5 — building fee $300 + plan review $195 + surcharges. Fees scale with project valuation per the city schedule.

City of Issaquah resourcesPermit portal ↗Fee schedule ↗