Demolition permits in City of Kent: fees, timeline & requirements (2026)

Everything you need to know about pulling a demolition permit in City of Kent, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Kent uses MyKent permits portal..

Permit required?
Yes — see threshold below
Permit fee
Demolition fees commonly charged as flat fee or by structure size. State surcharge $4.50 applies. Apply via https://mybuildingpermit.com.
Review timeline

When does a demolition need a permit in City of Kent?

2021 IBC Section 105.1 + WA-adopted IRC R105.1: demolition of any structure or portion thereof requires a permit. Tear-out of interior finishes only is generally treated as alteration. Asbestos / lead notification often required separately under WAC 173-303 / 296-62.

Required submittals

  • site plan
  • utility disconnect confirmations
  • asbestos survey (pre-1981 structures)
  • erosion / sediment control plan
  • haul route if structure >1500 sqft

Inspection sequence

  1. pre-demo (utilities + erosion)
  2. mid-demo if multi-day
  3. final site stabilization

Contractor specialties needed

general

Notes & caveats

Disconnect notices required from utilities (gas, electric, water, sewer) before issuance. Erosion control plan required where soil is disturbed. Bonded contractor typically required. Site stabilization + capped sewer line at completion.

Demolition permit fee estimate in City of Kent

Worked example for a $25,000 demolition project (building permit). Your actual fee scales with project valuation.

Building permit fee$391.25
Plan review$254.31
WA state surcharge$4.5
Estimated total$650.06

Demolition fees commonly charged as flat fee or by structure size. State surcharge $4.50 applies. Apply via https://mybuildingpermit.com. Computed from the City of Kent fee bracket schedule · source ↗. Impact/utility fees may apply separately.

How to apply

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Kent demolition — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (5).
  3. 3. Submit through the city portal: Kent uses MyKent permits portal.
  4. 4. Track review (typical: ). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Demolition fees commonly charged as flat fee or by structure size. State surcharge $4.50 applies. Apply via https://mybuildingpermit.com.) and pick up the permit. Inspection card travels with the job.

Demolition permits in City of Kent — FAQ

When does a demolition need a permit in City of Kent?

2021 IBC Section 105.1 + WA-adopted IRC R105.1: demolition of any structure or portion thereof requires a permit. Tear-out of interior finishes only is generally treated as alteration. Asbestos / lead notification often required separately under WAC 173-303 / 296-62.

How much does a demolition permit cost in City of Kent?

For a $25,000 demolition project, the estimated City of Kent permit fee is about $650.06 — building fee $391.25 + plan review $254.31 + surcharges. Fees scale with project valuation per the city schedule.

City of Kent resourcesPermit portal ↗Fee schedule ↗