Side sewer permits in City of Kent: fees, timeline & requirements (2026)

Everything you need to know about pulling a side sewer permit in City of Kent, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Kent Economic and Community Development.

Look up your City of Kent address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Kent's source.

Permit required?
Always
Permit fee
Side-sewer permit fees are set by the utility that owns the main; some add a depth-based surcharge. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com.
Review timeline
Not published by the city

When does a side sewer need a permit in City of Kent?

The side-sewer permit is issued by whichever utility owns the sanitary sewer — the city, a sewer or water district, or a regional utility — under that utility's own code, with WAC 51-56 (2021 UPC) governing how the building sewer is laid. WHICH UTILITY IS A PER-PROPERTY FACT: a lot can sit inside a city for permitting and outside its sewer district, so confirm the owner of the main before applying. Triggered by a new connection, repair of more than about 2 ft of pipe, relining (CIPP), or capping at the property line for a demolition.

From City of Kent's own code

“7.04.050 Permit required to construct, extend, or repair sewer. A permit is required for all work to construct, extend, relay, or repair a building sewer or a side sewer, or to make any connection to a side stub or the public sanitary sewer, whether that work is performed on private property or within the city right-of-way. In addition to any conditions expressed on the permit, all sewer permits are subject to the provisions of this chapter.”
Source ↗verified 2026-09-06

Required submittals

  • site plan with sewer line route
  • depth + slope detail
  • cleanout locations
  • utility locate ticket

Inspection sequence

  1. pre-cover (open trench)
  2. air / water test
  3. final

Contractor specialties needed

side-sewer-contractor

Who can do this work in City of Kent?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Kent and King County. Kolmo prepares the drawings and submittals, files the side sewer permit with Kent Economic and Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Kent side sewer quote.

Notes & caveats

Issuing body is the sanitary sewer utility, NOT the building department, and inspection is the utility's too. SOME utilities additionally require the contractor to hold a side-sewer card or registration before they will issue; it is not universal, so check the serving utility's own rules rather than assuming either way.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Kent side sewer — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (4).
  3. 3. Submit through the city portal: Kent Economic and Community Development ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Side-sewer permit fees are set by the utility that owns the main; some add a depth-based surcharge. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com.) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull side sewer permits in City of Kent every month. We prepare the drawings and submittals, file with Kent Economic and Community Development, handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Side sewer permits in City of Kent — FAQ

When does a side sewer need a permit in City of Kent?

The side-sewer permit is issued by whichever utility owns the sanitary sewer — the city, a sewer or water district, or a regional utility — under that utility's own code, with WAC 51-56 (2021 UPC) governing how the building sewer is laid. WHICH UTILITY IS A PER-PROPERTY FACT: a lot can sit inside a city for permitting and outside its sewer district, so confirm the owner of the main before applying. Triggered by a new connection, repair of more than about 2 ft of pipe, relining (CIPP), or capping at the property line for a demolition.

How much does a side sewer permit cost in City of Kent?

Current fee per the City of Kent fee schedule: Side-sewer permit fees are set by the utility that owns the main; some add a depth-based surcharge. Utility-issued, not building-permit-issued. Apply via https://mybuildingpermit.com. Plus ancillary plan-review/tech-surcharge fees per city schedule.

City of Kent resourcesPermit portal ↗Fee schedule ↗