Right-of-way permits in City of Lakewood: fees, timeline & requirements (2026)

Everything you need to know about pulling a right-of-way permit in City of Lakewood, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Lakewood Community Development..

Look up your City of Lakewood address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Lakewood's source.

Permit required?
Always
Permit fee
Right-of-way permit fees vary by city: a base fee for a residential driveway or curb cut, plus a per-day occupancy charge if the street is obstructed.
Review timeline
Not published by the city

When does a right-of-way need a permit in City of Lakewood?

Issued by city public works (or SDOT in Seattle) under local ROW ordinance. Triggered by physical occupation of or work within the public ROW including driveway aprons, curb cuts, sidewalk replacement, utility tie-ins, hauling routes, and temporary construction staging.

From City of Lakewood's own code

“A. General. City right-of-way shall not be blocked, occupied, privately improved or used for access or other purposes unless a permit has been issued for such use. B. Permit Required. A right-of-way permit is required before any person commences to grade or stockpile material; alter, construct, repair, remove, excavate, place, obstruct, damage or disturb any structure, utility, facility or improvement located in the public right-of-way; or commence any other activity that interferes with the free use of the public right-of-way. 1.”
Source ↗verified 2026-05-02

Required submittals

  • ROW work plan / sketch
  • traffic-control plan if arterial
  • certificate of insurance
  • bond if required

Inspection sequence

  1. pre-construction
  2. subgrade / base
  3. final ROW restoration

Contractor specialties needed

general

Who can do this work in City of Lakewood?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Lakewood and Pierce County. Kolmo prepares the drawings and submittals, files the right-of-way permit with Lakewood Community Development., carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Lakewood right-of-way quote.

Notes & caveats

Issuing body is city public works, not the building department. Often required as a precondition to a building permit (e.g. addition w/ new driveway). Bond + insurance commonly required. Traffic-control plan for arterial work.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Lakewood right-of-way — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (4).
  3. 3. Submit through the city portal: Lakewood Community Development. ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Right-of-way permit fees vary by city: a base fee for a residential driveway or curb cut, plus a per-day occupancy charge if the street is obstructed.) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull right-of-way permits in City of Lakewood every month. We prepare the drawings and submittals, file with Lakewood Community Development., handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Right-of-way permits in City of Lakewood — FAQ

When does a right-of-way need a permit in City of Lakewood?

Issued by city public works (or SDOT in Seattle) under local ROW ordinance. Triggered by physical occupation of or work within the public ROW including driveway aprons, curb cuts, sidewalk replacement, utility tie-ins, hauling routes, and temporary construction staging.

How much does a right-of-way permit cost in City of Lakewood?

Current fee per the City of Lakewood fee schedule: Right-of-way permit fees vary by city: a base fee for a residential driveway or curb cut, plus a per-day occupancy charge if the street is obstructed.. Plus ancillary plan-review/tech-surcharge fees per city schedule.

City of Lakewood resourcesPermit portal ↗Fee schedule ↗