Side sewer permits in City of Lynnwood: fees, timeline & requirements (2026)

Everything you need to know about pulling a side sewer permit in City of Lynnwood, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Lynnwood uses its own permit center..

Look up your City of Lynnwood address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Lynnwood's source.

Permit required?
Always
Permit fee
Side-sewer permit fees are set by the utility that owns the main; some add a depth-based surcharge. Utility-issued, not building-permit-issued.
Review timeline
Not published by the city

When does a side sewer need a permit in City of Lynnwood?

The side-sewer permit is issued by whichever utility owns the sanitary sewer — the city, a sewer or water district, or a regional utility — under that utility's own code, with WAC 51-56 (2021 UPC) governing how the building sewer is laid. WHICH UTILITY IS A PER-PROPERTY FACT: a lot can sit inside a city for permitting and outside its sewer district, so confirm the owner of the main before applying. Triggered by a new connection, repair of more than about 2 ft of pipe, relining (CIPP), or capping at the property line for a demolition.

From City of Lynnwood's own code

“An owner may request that a side sewer that is no longer needed to serve a building be capped. The owner shall apply for a sewer capping permit. The sewer capping permit application shall be submitted to the department of public works for processing as required by LMC 2.44.040 . Sewer capping fees shall be as shown in Chapter 3.104 LMC. (Ord. 2656 §§ 1, 2, 2006; Ord. 2076 § 14, 1996)”
Source ↗verified 2026-05-02

Required submittals

  • site plan with sewer line route
  • depth + slope detail
  • cleanout locations
  • utility locate ticket

Inspection sequence

  1. pre-cover (open trench)
  2. air / water test
  3. final

Contractor specialties needed

side-sewer-contractor

Who can do this work in City of Lynnwood?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Lynnwood and Snohomish County. Kolmo prepares the drawings and submittals, files the side sewer permit with Lynnwood uses its own permit center., carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Lynnwood side sewer quote.

Notes & caveats

Issuing body is the sanitary sewer utility, NOT the building department, and inspection is the utility's too. SOME utilities additionally require the contractor to hold a side-sewer card or registration before they will issue; it is not universal, so check the serving utility's own rules rather than assuming either way.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Lynnwood side sewer — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (4).
  3. 3. Submit through the city portal: Lynnwood uses its own permit center. ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Side-sewer permit fees are set by the utility that owns the main; some add a depth-based surcharge. Utility-issued, not building-permit-issued.) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull side sewer permits in City of Lynnwood every month. We prepare the drawings and submittals, file with Lynnwood uses its own permit center., handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Side sewer permits in City of Lynnwood — FAQ

When does a side sewer need a permit in City of Lynnwood?

The side-sewer permit is issued by whichever utility owns the sanitary sewer — the city, a sewer or water district, or a regional utility — under that utility's own code, with WAC 51-56 (2021 UPC) governing how the building sewer is laid. WHICH UTILITY IS A PER-PROPERTY FACT: a lot can sit inside a city for permitting and outside its sewer district, so confirm the owner of the main before applying. Triggered by a new connection, repair of more than about 2 ft of pipe, relining (CIPP), or capping at the property line for a demolition.

How much does a side sewer permit cost in City of Lynnwood?

Current fee per the City of Lynnwood fee schedule: Side-sewer permit fees are set by the utility that owns the main; some add a depth-based surcharge. Utility-issued, not building-permit-issued.. Plus ancillary plan-review/tech-surcharge fees per city schedule.

City of Lynnwood resourcesPermit portal ↗Fee schedule ↗