Demolition permits in City of Puyallup: fees, timeline & requirements (2026)
Everything you need to know about pulling a demolition permit in City of Puyallup, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Puyallup uses Accela ACA..
Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Puyallup's source.
When does a demolition need a permit in City of Puyallup?
2021 IBC Section 105.1 + WA-adopted IRC R105.1: demolition of any structure or portion thereof requires a permit. Tear-out of interior finishes only is generally treated as alteration. Asbestos / lead notification often required separately under WAC 173-303 / 296-62.
How City of Puyallup adopted this rule
The threshold comes from the state code (WAC 51.51), which City of Puyallup adopts by reference in the provision quoted below.
“The city of Puyallup hereby adopts the following codes by reference, which are incorporated herein, as they currently exist or are hereafter amended: (1) The current edition of the International Building Code, published by the International Code Council, Inc., as adopted by the Washington State Building Code Council in Chapter 51-50 WAC. The following appendix of the International Building Code is specifically adopted in its entirety: (a) Appendix E: Supplementary Accessibility Requirements.”Source ↗verified 2026-05-02
Required submittals
- site plan
- utility disconnect confirmations
- asbestos survey (pre-1981 structures)
- erosion / sediment control plan
- haul route if structure >1500 sqft
Inspection sequence
- pre-demo (utilities + erosion)
- mid-demo if multi-day
- final site stabilization
Contractor specialties needed
general
Who can do this work in City of Puyallup?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Puyallup and Pierce County. Kolmo prepares the drawings and submittals, files the demolition permit with Puyallup uses Accela ACA., carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Puyallup demolition quote.
Notes & caveats
Disconnect notices required from utilities (gas, electric, water, sewer) before issuance. Erosion control plan required where soil is disturbed. Bonded contractor typically required. Site stabilization + capped sewer line at completion.
How to apply yourself
- 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Puyallup demolition — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
- 2. Assemble submittals (5).
- 3. Submit through the city portal: Puyallup uses Accela ACA. ↗
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (Demolition fees commonly charged as flat fee or by structure size. State surcharge $6.50 applies.) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
We pull demolition permits in City of Puyallup every month. We prepare the drawings and submittals, file with Puyallup uses Accela ACA., handle reviewer comments, and build the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Demolition permits in City of Puyallup — FAQ
When does a demolition need a permit in City of Puyallup?
2021 IBC Section 105.1 + WA-adopted IRC R105.1: demolition of any structure or portion thereof requires a permit. Tear-out of interior finishes only is generally treated as alteration. Asbestos / lead notification often required separately under WAC 173-303 / 296-62.
How much does a demolition permit cost in City of Puyallup?
Current fee per the City of Puyallup fee schedule: Demolition fees commonly charged as flat fee or by structure size. State surcharge $6.50 applies.. Plus ancillary plan-review/tech-surcharge fees per city schedule.
