Right-of-way permits in Renton: fees, timeline & requirements (2026)

Everything you need to know about pulling a right-of-way permit in Renton, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Renton Community and Economic Development — Development Services.

Look up your Renton address

Free lookup, no account needed — your lot lines, where the lot meets the street, cited to Renton's source.

Permit required?
Always
Permit fee
Right-of-way permit fees are in the Renton fee schedule; once the application meets City standards, the City emails the permit fee and any remaining documents for issuance.
Review timeline
Not published by the city

When does right-of-way work need a permit in Renton?

Renton requires a Right-of-Way Permit "for any activity or private use of the public right of way", including construction, excavation, sidewalk cafes, street eateries and oversize loads (City of Renton, Right-of-Way Permit page). RMC 9-10-1 makes it unlawful to "construct, cut up, dig up, undermine, break, excavate, tunnel or in any way disturb or obstruct any street, alley or any street pavement, street curb, sidewalk, driveway or improvement in the City without first having obtained written permission", and under RMC 9-10-2 the Department of Community and Economic Development issues the permit on a written application with a plat or sketch drawn to scale and a performance bond. Renton sets the permit type by how long the right of way will be used: short-term under 30 days, short-term from 30 days to 1 year, and long-term over 1 year.

From Renton's own code

“9-10-1 PERMISSION REQUIRED: It shall be unlawful for any person, firm, corporation or association to construct, cut up, dig up, undermine, break, excavate, tunnel or in any way disturb or obstruct any street, alley or any street pavement, street curb, sidewalk, driveway or improvement in the City without first having obtained written permission as herein provided;”
Source ↗verified 2026-09-25

Required submittals

  • Right-of-Way Permit application on the City of Renton online permit portal
  • Engineering plans showing the proposed use of the right of way (if construction will occur)
  • Plat or sketch drawn to scale showing the location and plan of the work (RMC 9-10-2.A)
  • Performance bond (RMC 9-10-2.A)
  • Justification request letter (long-term permits only)

Inspection sequence

  1. Pre-construction
  2. Subgrade / base
  3. Final ROW restoration

Contractor specialties needed

General contractor

Who can do this work in Renton?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Renton and King County. Kolmo prepares the drawings and submittals, files the right-of-way permit with Renton Community and Economic Development — Development Services, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Renton right-of-way quote.

Notes & caveats

Issued by the City of Renton: RMC 9-10-2 names the Department of Community and Economic Development, and the City's Right-of-Way Permit page routes questions to Development Engineering (425-430-7240). Apply on the City's online permit portal. Renton's published processing times once an application is complete: 1 to 2 business days for short-term use under 30 days, 1 to 2 weeks for 30 days to 1 year, 3 to 4 weeks for long-term use. Engineering plans are required if construction will occur; a long-term request also needs a justification letter. The permittee restores the street, sidewalk, curb or driveway it disturbs and guarantees that work for two years (RMC 9-10-2). Franchise utility work (telephone, power, gas, cable) is permitted to the utility provider. Renton lists a Traffic Control Plan among its separate site-work permits.

How to apply yourself

  1. 1. Find where your lot meets the street. Run an address lookup for your right-of-way work in Renton — we'll pull your lot lines as the county maps them, which show where the lot ends and the public right-of-way begins.
  2. 2. Assemble submittals: the 5 documents under Required submittals above.
  3. 3. Submit through the city portal: Renton Community and Economic Development — Development Services ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Renton's fee schedule sets them) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Renton Community and Economic Development — Development Services, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Right-of-way permits in Renton — FAQ

When does right-of-way work need a permit in Renton?

Renton requires a Right-of-Way Permit "for any activity or private use of the public right of way", including construction, excavation, sidewalk cafes, street eateries and oversize loads (City of Renton, Right-of-Way Permit page). RMC 9-10-1 makes it unlawful to "construct, cut up, dig up, undermine, break, excavate, tunnel or in any way disturb or obstruct any street, alley or any street pavement, street curb, sidewalk, driveway or improvement in the City without first having obtained written permission", and under RMC 9-10-2 the Department of Community and Economic Development issues the permit on a written application with a plat or sketch drawn to scale and a performance bond. Renton sets the permit type by how long the right of way will be used: short-term under 30 days, short-term from 30 days to 1 year, and long-term over 1 year.

How much does a right-of-way permit cost in Renton?

Right-of-way permit fees are in the Renton fee schedule; once the application meets City standards, the City emails the permit fee and any remaining documents for issuance. Apply via https://permitting.rentonwa.gov.