When does side sewer work need a permit in Sammamish?
The side-sewer permit comes from the utility that owns the sewer main (the city, a sewer or water district, or a regional utility), under that utility's own code. Which utility is a per-property fact: a lot can sit inside a city for permitting and outside its sewer district, so confirm the owner of the main before applying. The utility's code, not a statewide rule, decides which work needs the permit: a new connection does, and many utility codes also require it for any repair, however short, and for capping or disconnecting a side sewer, so check that code before digging. WAC 51-56, the state plumbing code, governs how the building sewer is laid.
Required submittals
- Site plan with sewer line route
- Depth + slope detail
- Cleanout locations
- Utility locate ticket
Inspection sequence
- Pre-cover (open trench)
- Air / water test
- Final
Contractor specialties needed
Side sewer contractor
Who can do this work in Sammamish?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Sammamish and King County. Kolmo prepares the drawings and submittals, files the side sewer permit with Sammamish Plateau Water or Northeast Sammamish Sewer and Water District, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Sammamish side sewer quote.
Notes & caveats
Issuing body is the sanitary sewer utility, NOT the building department, and inspection is the utility's too. SOME utilities additionally require the contractor to hold a side-sewer card or registration before they will issue; it is not universal, so check the serving utility's own rules rather than assuming either way.
How to apply yourself
- 1. Confirm your parcel's zoning & overlays. Run an address lookup for your side sewer work in Sammamish — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
- 2. Assemble submittals: the 4 documents under Required submittals above.
- 3. Apply with Sammamish Plateau Water or Northeast Sammamish Sewer and Water District.
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (Sammamish Plateau Water or Northeast Sammamish Sewer and Water District sets them) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
Kolmo prepares the drawings and submittals, files with Sammamish Plateau Water or Northeast Sammamish Sewer and Water District, handles reviewer comments, and builds the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Side sewer permits in Sammamish — FAQ
When does side sewer work need a permit in Sammamish?
The side-sewer permit comes from the utility that owns the sewer main (the city, a sewer or water district, or a regional utility), under that utility's own code. Which utility is a per-property fact: a lot can sit inside a city for permitting and outside its sewer district, so confirm the owner of the main before applying. The utility's code, not a statewide rule, decides which work needs the permit: a new connection does, and many utility codes also require it for any repair, however short, and for capping or disconnecting a side sewer, so check that code before digging. WAC 51-56, the state plumbing code, governs how the building sewer is laid.
How much does a side sewer permit cost in Sammamish?
King County's sewer service area map shows Sammamish served mostly by Sammamish Plateau Water and in part by Northeast Sammamish Sewer and Water District; the City has no sewer utility of its own. The side sewer permit and its fees come from the utility that serves the lot, under its own rules and fee schedule, not from the City's building permit, so confirm the lot's utility before applying. Utilities: Sammamish Plateau Water (https://www.spwater.org/), Northeast Sammamish Sewer and Water District (https://www.nesswd.org/).