When does side sewer work need a permit in Seattle?
Seattle Public Utilities (SPU) issues the side sewer permit, and inspects the work, for property served by the City's sewer and drainage system. A permit is required to connect a property to the public sewer or a storm drain, and to construct, repair, alter or add to, or to abandon, remove or cap, any sanitary or drainage side sewer (SMC 21.16.070). There is no minimum length: SPU requires its repair permit anytime a pipe or an outside fixture such as a cleanout or yard drain is repaired or replaced, and capping a side sewer for a demolition takes a stand-alone capping permit. Only a registered side sewer contractor may work in a public place (SMC 21.16.055). WAC 51-56, the state plumbing code, governs how the building sewer is laid.
From Seattle's own code
“A. It is unlawful to connect any property or premises to a sanitary or combined sewer, or storm drain, or to construct or to make repairs, alterations, additions to, or to abandon, remove, or cap any side sewer or service drain connecting to the sanitary or combined sewer, or storm drain, without first applying for and securing a permit for such work from the Director of Seattle Public Utilities and without first paying the fee as prescribed by Director's Rule.”Source ↗verified 2026-10-24
Required submittals
- Site plan with sewer line route
- Depth + slope detail
- Cleanout locations
- Utility locate ticket
Inspection sequence
- Pre-cover (open trench)
- Air / water test
- Final
Contractor specialties needed
Side sewer contractor
Who can do this work in Seattle?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Seattle and King County. Kolmo prepares the drawings and submittals, files the side sewer permit with Seattle Public Utilities (SPU), carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Seattle side sewer quote.
Notes & caveats
Issuing body is the sanitary sewer utility, not the building department, and inspection is the utility's too. Some utilities additionally require the contractor to hold a side-sewer card or registration before they will issue; it is not universal, so check the serving utility's own rules rather than assuming either way.
How to apply yourself
- 1. Draw the side sewer. Run an address lookup for your side sewer work in Seattle — we'll pull your lot lines and the house, and you can draw the side sewer's run to the street on a plan of the lot.
- 2. Assemble submittals: the 4 documents under Required submittals above.
- 3. Apply with Seattle Public Utilities (SPU).
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (Seattle Public Utilities (SPU) sets them) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
Kolmo prepares the drawings and submittals, files with Seattle Public Utilities (SPU), handles reviewer comments, and builds the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Side sewer permits in Seattle — FAQ
When does side sewer work need a permit in Seattle?
Seattle Public Utilities (SPU) issues the side sewer permit, and inspects the work, for property served by the City's sewer and drainage system. A permit is required to connect a property to the public sewer or a storm drain, and to construct, repair, alter or add to, or to abandon, remove or cap, any sanitary or drainage side sewer (SMC 21.16.070). There is no minimum length: SPU requires its repair permit anytime a pipe or an outside fixture such as a cleanout or yard drain is repaired or replaced, and capping a side sewer for a demolition takes a stand-alone capping permit. Only a registered side sewer contractor may work in a public place (SMC 21.16.055). WAC 51-56, the state plumbing code, governs how the building sewer is laid.
How much does a side sewer permit cost in Seattle?
Seattle Public Utilities issues the side sewer permit and sets its fee by Director's Rule (SMC 21.16.070). Under SPU's 2026 rule, a new, relocated or altered side sewer is $375 for the first connection and $280 for each additional one, with $75 for each pump; a repair is $280, capping a line $375 and a temporary service $225. Each permit includes one hour of inspection, and further inspection time is $160 an hour (Director's Rule FIN-220.2).