Attached ADU (AADU) Permits in Issaquah
An ADU built inside or attached to the primary residence — basement conversion, garage conversion, or bump-out addition. Lower cost; constrained by the primary footprint.
Free lookup: your lot’s zoning and setbacks, with an attached ADU placed on it to move and turn.
Permit fees in Issaquah
Set by the Issaquah fee schedule.
Issaquah fee scheduleIssaquah prices an ADU's building permit on the value of the work: $544.06 for the first $25,000 plus $14.23 for each $1,000 more up to $50,000, $895.06 for the first $50,000 plus $9.44 for each $1,000 more up to $100,000, and $1,381.06 for the first $100,000 plus $8.09 for each $1,000 more up to $500,000. Plan review adds 65% of that fee; for new construction the plumbing and mechanical permits are each 8% of the building permit fee; a 6% technology surcharge is added; and the state building code fee is $6.50. An optional pre-application meeting for an ADU is $311.29. The City's impact fee handout names ADUs among the most common exemptions from its impact fees. Where the ADU takes a new City water meter, a 3/4-inch meter carries $9,644.97 in City facilities charges, $8,852 in regional capital facilities charges and a $1,000 Cascade Water Alliance surcharge; the City's sewer general facilities charge is $4,410 per residential customer equivalent, and King County bills its sewer capacity charge separately. Electrical permits come from L&I. Apply via mybuildingpermit.com.
Review timeline
Typical: 45–120 business days
What Issaquah asks for with an attached ADU
Every application (11)
- Building permit application at MyBuildingPermit (Building / Single Family Residential / New construction / Residence and All Associated Structures)
- Utility Services Application (City of Issaquah)
- Residential Water Meter Sizing Form
- Plumbing / Mechanical Fixture Counts form
- Letter of water and sewer availability (City of Issaquah, or Sammamish Plateau Water)
- King County Residential Sewer Use Certification (sewage treatment capacity charge)
- Traffic Concurrency Certificate (its own MyBuildingPermit application)
- Site plan with vicinity map
- Floor plan
- WSEC energy compliance, prescriptive path
- WSEC worksheet and Heat System Sizing form (WSU Energy Program)
Where the lot or the work calls for it
Where the ADU adds onto the house or changes its structure
- Geotechnical report (soils report)
- Structural calculations, gravity and lateral, stamped
Where the ADU adds onto the house or changes its outside walls, windows or roof
- Typical building / wall section
- Building elevations N/S/E/W
- Major materials schedule
Where the work changes the outside walls, windows or roof
- Glazing + door schedule (NFRC U-factor / SHGC)
Where the lot is in a flood zone
- Flood Hazard Permit (separate land use permit)
From 2,000 sq ft of new hard surface
- Stormwater Technical Information Report (drainage report)
Each where the condition beside it holds
- Covenant Not-to-Sue (steep slope of 40% or more, or floodplain)
From the city’s own documents: City of Issaquah — Accessory Dwelling Unit (ADU) Submittal Requirements (February 2026) · City of Issaquah — Accessory Dwelling Unit (ADU), last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.
AADU-specific requirements
- Egress on every bedroom — IRC R310 net clear opening ≥5.7 sf; sill ≤44″ from floor.
- Smoke + CO alarms — interconnected throughout primary + AADU per IRC R314/R315.
- 1-hr separation — required between AADU and primary in some cases; otherwise a continuous draft stop.
- Independent kitchen + bath — full plumbing + cooking provision in the AADU.
- Address or unit number — the city or county assigns addresses; ask the permit center whether the unit gets its own.