ADU Permits in Issaquah

Rules for detached (DADU) and attached (AADU) accessory dwelling units in Issaquah, King County.

Free lookup. We’ll resolve your zoning, setbacks, and which ADU types are allowed on your specific parcel.

Choose an ADU type for your parcel

State law (RCW 36.70A.681) requires Issaquah to allow two ADUs on a lot in a single-family zone — one attached and one detached, two attached, or two detached — except on lots with critical areas or their buffers. An address’s own page checks its lot’s zoning.

Issaquah permit-process facts

Permit department

Submit through the Issaquah permit portal.

Permit portal

ADU permit fees

Set by the Issaquah fee schedule.

Fee schedule

Issaquah prices an ADU's building permit on the value of the work: $544.06 for the first $25,000 plus $14.23 for each $1,000 more up to $50,000, $895.06 for the first $50,000 plus $9.44 for each $1,000 more up to $100,000, and $1,381.06 for the first $100,000 plus $8.09 for each $1,000 more up to $500,000. Plan review adds 65% of that fee; for new construction the plumbing and mechanical permits are each 8% of the building permit fee; a 6% technology surcharge is added; and the state building code fee is $6.50. An optional pre-application meeting for an ADU is $311.29. The City's impact fee handout names ADUs among the most common exemptions from its impact fees. Where the ADU takes a new City water meter, a 3/4-inch meter carries $9,644.97 in City facilities charges, $8,852 in regional capital facilities charges and a $1,000 Cascade Water Alliance surcharge; the City's sewer general facilities charge is $4,410 per residential customer equivalent, and King County bills its sewer capacity charge separately. Electrical permits come from L&I. Apply via mybuildingpermit.com.

Review timeline

Typical: 45–120 business days

HB 1337 conformance

Issaquah permits at least two ADUs per single-family lot, with no owner-occupancy requirement and parking limits that respect the HB 1337 ceilings.

Building code: 2021 IBC w/ WA amendments · Residential: 2021 IRC w/ WA amendments · Energy (WSEC): 2021 WSEC

These are Issaquah’s ADU rules as Kolmo reads them; an address’s own page adds its setbacks, easements and critical-area buffers. Source: issaquah.municipal.codes, last verified 2026-05-16.

ADU permits in Issaquah — FAQ

Does Issaquah allow detached ADUs (DADUs)?

Yes. Washington's HB 1337 (RCW 36.70A.681) requires Issaquah to allow at least two accessory dwelling units on a lot in a single-family zone within the urban growth area, attached or detached in any combination, except on lots with critical areas or their buffers.

What is the maximum ADU size in Issaquah?

State law bars a city from setting a maximum ADU size below 1,000 sq ft of gross floor area (RCW 36.70A.681(1)(f)). Issaquah's own maximum may be higher — the per-parcel page shows it with the city's code citation.

How long does ADU permit review take in Issaquah?

Issaquah's ADU permits typically review in 45–120 business days. Pre-approved standard plans (where available) cut this further.