Detached ADU (DADU) Permits in Issaquah
A standalone backyard cottage with its own foundation, roof, and exterior. Maximum flexibility on layout; highest construction cost. State law bars a city maximum below 1,000 sq ft of gross floor area, except on lots with critical areas (RCW 36.70A.681).
Free lookup: your lot’s zoning and setbacks, with a detached ADU placed on it to move and turn.
Permit fees in Issaquah
Set by the Issaquah fee schedule.
Issaquah fee scheduleIssaquah prices an ADU's building permit on the value of the work: $544.06 for the first $25,000 plus $14.23 for each $1,000 more up to $50,000, $895.06 for the first $50,000 plus $9.44 for each $1,000 more up to $100,000, and $1,381.06 for the first $100,000 plus $8.09 for each $1,000 more up to $500,000. Plan review adds 65% of that fee; for new construction the plumbing and mechanical permits are each 8% of the building permit fee; a 6% technology surcharge is added; and the state building code fee is $6.50. An optional pre-application meeting for an ADU is $311.29. The City's impact fee handout names ADUs among the most common exemptions from its impact fees. Where the ADU takes a new City water meter, a 3/4-inch meter carries $9,644.97 in City facilities charges, $8,852 in regional capital facilities charges and a $1,000 Cascade Water Alliance surcharge; the City's sewer general facilities charge is $4,410 per residential customer equivalent, and King County bills its sewer capacity charge separately. Electrical permits come from L&I. Apply via mybuildingpermit.com.
Review timeline
Typical: 45–120 business days
What Issaquah asks for with a detached ADU
Every application (19)
- Building permit application at MyBuildingPermit (Building / Single Family Residential / New Construction / Detached Accessory Dwelling Unit)
- Utility Services Application (City of Issaquah)
- Residential Water Meter Sizing Form
- King County Residential Sewer Use Certification (sewage treatment capacity charge)
- Traffic Concurrency Certificate (its own MyBuildingPermit application)
- Site plan with vicinity map
- TESC plan sheet, with clearing limits
- Geotechnical report (soils report)
The other 11
- Foundation plan
- Floor plan
- Roof + floor framing plan
- Typical building / wall section
- Building elevations N/S/E/W
- Glazing + door schedule (NFRC U-factor / SHGC)
- Structural design notes (loads, materials, inspections)
- Major materials schedule
- WSEC energy compliance, prescriptive path
- WSEC worksheet and Heat System Sizing form (WSU Energy Program)
- Plan sheets 24×36, title block on the right margin with a 2×2-inch approval area
Where the lot or the work calls for it
Where the lot is in a flood zone
- Flood Hazard Permit (separate land use permit)
From 2,000 sq ft of new hard surface
- Stormwater Technical Information Report (drainage report)
Where the lot has a steep slope, is in a landslide hazard area, is in a seismic hazard area or is in a coal mine hazard area
- Structural calculations, gravity and lateral, stamped
Each where the condition beside it holds
- Covenant Not-to-Sue (steep slope of 40% or more, or floodplain)
From the city’s own documents: City of Issaquah — Single Family Residential: New Construction – Detached Accessory Dwelling Unit Building Permit Submittal Requirements (July 2026) · City of Issaquah — Accessory Dwelling Unit (ADU) · City of Issaquah — Accessory Dwelling Unit (ADU) Submittal Requirements (February 2026), last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.