Detached ADU (DADU) Permits in Kirkland

A standalone backyard cottage with its own foundation, roof, and exterior. Maximum flexibility on layout; highest construction cost. State law bars a city maximum below 1,000 sq ft of gross floor area, except on lots with critical areas (RCW 36.70A.681).

Free lookup: your lot’s zoning and setbacks, with a detached ADU placed on it to move and turn.

Permit fees in Kirkland

Set by the Kirkland fee schedule.

Kirkland fee schedule

Kirkland prices an ADU's building permit on the value of the work: $639 for the first $25,000 plus $17.46 for each $1,000 more up to $50,000, $1,048 for the first $50,000 plus $10.27 for each $1,000 more up to $100,000, and $1,620 for the first $100,000 plus $8.22 for each $1,000 more up to $1,000,000. Plan review is 65% of that fee, the energy code fee $101 plus 1 cent per square foot of heated or cooled space, and the state building code fee $6.50. For new construction, the plumbing and mechanical permits are each 8% of the building permit fee and the City's electrical permit 9.5%. An ADU over 800 square feet pays impact fees per square foot: park $2.59, fire $0.38 of conditioned floor area, and transportation $2.26 (July-December 2026). A separate planning review of the ADU, $634, is not required when it is reviewed with the building permit. A 3.5% technology fee is added to the City's permit and plan review fees (Kirkland Building Services Fees, 2026). Apply via mybuildingpermit.com.

Review timeline

Measured, detached ADU: half issued within 217 days of application, 80% within 33530 permits, last 12 months. Source: City of Kirkland single-family building permits (type BSF) on MyBuildingPermit.com.

What Kirkland asks for with a detached ADU

Every application (22)

  • Building permit application at MyBuildingPermit (Kirkland)
  • Supplemental Building Information form
  • ADU Registration Application
  • Rodent Abatement Declaration
  • Single Family Plumbing Worksheet
  • Sewer Availability Certificate, where a district other than the City serves the lot, or on septic
  • Water Availability Certificate, where a district other than the City serves the lot
  • Boundary and topographic survey, stamped by a Washington licensed surveyor
The other 14
  • Site plan
  • Building Height Table (Height Survey Requirement and Calculations Form)
  • Tree Retention Plan (KZC 95.30)
  • Foundation plan
  • Floor plan
  • Roof plan
  • Roof + floor framing plan
  • Typical building / wall section
  • Building elevations N/S/E/W
  • Glazing + door schedule (NFRC U-factor / SHGC)
  • Structural design notes (loads, materials, inspections)
  • Major materials schedule
  • WSEC energy compliance and whole house ventilation, on the plans
  • Kirkland Energy Code Sheet, a separate document

Where the lot or the work calls for it

From 500 sq ft of new hard surface

  • Erosion and Sedimentation Control (ESC) Plan
  • Construction Stormwater Pollution Prevention (CSWPP) Plan, on the City's template

Where the lot has a steep slope, is in a landslide hazard area or is in a seismic hazard area

  • Structural calculations, stamped

Each where the condition beside it holds

  • Stormwater Drainage Plan (from 500 sq ft of new or replaced impervious surface)
  • Stormwater Drainage Report / TIR (from 2,000 sq ft)

From the city’s own documents: City of Kirkland — Single Family/Duplex Permit Checklist · City of Kirkland — Height Survey Requirement and Calculations Form, last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.