Choose an ADU type for your parcel
State law (RCW 36.70A.681) requires Mercer Island to allow two ADUs on a lot in a single-family zone — one attached and one detached, two attached, or two detached — except on lots with critical areas or their buffers. An address’s own page checks its lot’s zoning.
DADU — Detached
Backyard cottage with its own foundation and roof. Most flexibility on layout.
AADU — Attached
Part of the house or built onto it: a converted basement or garage, or an addition.
Pre-approved plans
None in Mercer Island on Washington Commerce’s statewide list of pre-approved plan programs (November 2026): an ADU here is drawn for its lot.
The state’s listMercer Island permit-process facts
ADU permit fees
Set by the Mercer Island fee schedule.
Fee schedulePhase A Land Use fee per MI Fee Schedule (Type II Land Use Review line). Phase B Building permit fee is valuation-based: ~$2,100 building + ~$1,365 plan review (65%) + WA BCC $6.50 + per-fixture plumbing/mech fees at $280k valuation. Impact fees (school, transportation, parks) ~$5,000-$15,000 BEFORE HB 1337's 50% ADU cap — confirm MI has updated its schedule.
Review timeline
Typical: 30–90 business days
HB 1337 conformance
Mercer Island permits at least two ADUs per single-family lot, with no owner-occupancy requirement and parking limits that respect the HB 1337 ceilings.
These are Mercer Island’s ADU rules as Kolmo reads them; an address’s own page adds its setbacks, easements and critical-area buffers. Source: library.municode.com, last verified 2026-05-16.
ADU permits in Mercer Island — FAQ
Does Mercer Island allow detached ADUs (DADUs)?
Yes. Washington's HB 1337 (RCW 36.70A.681) requires Mercer Island to allow at least two accessory dwelling units on a lot in a single-family zone within the urban growth area, attached or detached in any combination, except on lots with critical areas or their buffers.
What is the maximum ADU size in Mercer Island?
State law bars a city from setting a maximum ADU size below 1,000 sq ft of gross floor area (RCW 36.70A.681(1)(f)). Mercer Island's own maximum may be higher — the per-parcel page shows it with the city's code citation.
How long does ADU permit review take in Mercer Island?
Mercer Island's ADU permits typically review in 30–90 business days. Pre-approved standard plans (where available) cut this further.