Attached ADU (AADU) Permits in Redmond

An ADU built inside or attached to the primary residence — basement conversion, garage conversion, or bump-out addition. Lower cost; constrained by the primary footprint.

Free lookup: your lot’s zoning and setbacks, with an attached ADU placed on it to move and turn.

Permit fees in Redmond

Set by the Redmond fee schedule.

Redmond fee schedule

Redmond prices an ADU's building permit on the value of the work: $1,285.25 for the first $50,000 plus $14.01 for each $1,000 more up to $100,000, and $1,984.02 for the first $100,000 plus $11.20 for each $1,000 more up to $500,000. Plan review is 65% of that fee, plus Planning review, $825.15 for new residential construction or $324.01 for a residential addition, and the $796.48 fire fee for residential new construction, additions and accessory structures. Electrical, mechanical and plumbing permits are separate City permits, each from a $140.71 base fee. A 4% technology surcharge applies to the total, plus the $6.50 state building code fee (2026 fee schedules). Apply through the Redmond ePermitting Service, REPS (cityofredmondwa-energovweb.tylerhost.net/apps/selfservice); plan-reviewed permits go through Plan Review Online, and the How to Apply page (redmond.gov/462/How-to-Apply) says which.

Review timeline

Not published by Redmond.

What Redmond asks for with an attached ADU

Every application (7)

  • Residential Application, through Plan Review Online (PRO)
  • Side sewer TV inspection: recording and report
  • Site plan with vicinity map
  • Floor plan
  • Fire sprinkler system: separate Fire Sprinkler permit
  • WSEC energy compliance, prescriptive path
  • Energy code forms (WSU): prescriptive worksheet, glazing schedule, heating system sizing

Where the lot or the work calls for it

Where the ADU adds onto the house or changes its outside walls, windows or roof

  • Typical building / wall section
  • Building elevations N/S/E/W
  • Major materials schedule

Where the work changes the outside walls, windows or roof

  • Glazing + door schedule (NFRC U-factor / SHGC)

From the city’s own documents: City of Redmond Residential Application Packet (Published 09/2026) · City of Redmond SFR and Middle Housing Building Permit User Guide (Published 06/2025), last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.

AADU-specific requirements

  • Egress on every bedroom — IRC R310 net clear opening ≥5.7 sf; sill ≤44″ from floor.
  • Smoke + CO alarms — interconnected throughout primary + AADU per IRC R314/R315.
  • 1-hr separation — required between AADU and primary in some cases; otherwise a continuous draft stop.
  • Independent kitchen + bath — full plumbing + cooking provision in the AADU.
  • Address or unit number — the city or county assigns addresses; ask the permit center whether the unit gets its own.