ADU Permits in City of Redmond

Verified rules for detached (DADU), attached (AADU), and junior (JADU) accessory dwelling units in City of Redmond, King County. HB 1337 conformant.

Free lookup. We’ll resolve your zoning, setbacks, and which ADU types are allowed on your specific parcel.

Choose an ADU type for your parcel

All three are permitted in City of Redmond under HB 1337. Pick the one that fits your goals and lot constraints; the per-parcel canvas verifies it against your specific zoning.

City of Redmond permit-process facts

Permit department

Submit through the City of Redmond permit portal.

Permit portal

ADU permit fees

Fee schedule not yet aggregated. Check the City of Redmond fee schedule directly.

Fee schedule

Review timeline

Typical: 2160 business days

HB 1337 conformance

City of Redmond permits at least two ADUs per single-family lot, with no owner-occupancy requirement and parking limits that respect the HB 1337 ceilings.

Building code: 2021 IBC w/ WA amendments · Residential: 2021 IRC w/ WA amendments · Energy (WSEC): 2021 WSEC

Rules above are aggregated from City of Redmond’s permit-rules table; per-parcel facts (your specific setbacks, easements, ECA buffers) are pulled live on the parcel page. Primary source: https://www.redmond.gov/154/Permit-Information. Last verified 2026-04-26.