Detached ADU (DADU) Permits in Redmond
A standalone backyard cottage with its own foundation, roof, and exterior. Maximum flexibility on layout; highest construction cost. State law bars a city maximum below 1,000 sq ft of gross floor area, except on lots with critical areas (RCW 36.70A.681).
Free lookup: your lot’s zoning and setbacks, with a detached ADU placed on it to move and turn.
Permit fees in Redmond
Set by the Redmond fee schedule.
Redmond fee scheduleRedmond prices an ADU's building permit on the value of the work: $1,285.25 for the first $50,000 plus $14.01 for each $1,000 more up to $100,000, and $1,984.02 for the first $100,000 plus $11.20 for each $1,000 more up to $500,000. Plan review is 65% of that fee, plus Planning review, $825.15 for new residential construction or $324.01 for a residential addition, and the $796.48 fire fee for residential new construction, additions and accessory structures. Electrical, mechanical and plumbing permits are separate City permits, each from a $140.71 base fee. A 4% technology surcharge applies to the total, plus the $6.50 state building code fee (2026 fee schedules). Apply through the Redmond ePermitting Service, REPS (cityofredmondwa-energovweb.tylerhost.net/
Review timeline
Not published by Redmond.
What Redmond asks for with a detached ADU
Every application (15)
- Residential Application, through Plan Review Online (PRO)
- Side sewer TV inspection: recording and report
- Site plan, with the Planning Tables
- Foundation plan
- Floor plan
- Roof plan
- Roof + floor framing plan
- Typical building / wall section
The other 7
- Building elevations N/S/E/W
- Glazing + door schedule (NFRC U-factor / SHGC)
- Structural design notes (loads, materials, inspections)
- Major materials schedule
- Fire sprinkler system: separate Fire Sprinkler permit
- WSEC energy compliance, prescriptive path
- Energy code forms (WSU): prescriptive worksheet, glazing schedule, heating system sizing
Where the lot or the work calls for it
In some zones
- Affordable Housing Payment in Lieu (AHPIL) fee form
From 2,000 sq ft of new hard surface
- Stormwater: Ecology Minimum Requirements 1-5
Where the lot has a steep slope, is in a landslide hazard area or has ground that needs a soils study
- Structural calculations, stamped
From the city’s own documents: City of Redmond Residential Application Packet (Published 09/2026) · City of Redmond SFR and Middle Housing Building Permit User Guide (Published 06/2025), last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.