Attached ADU (AADU) Permits in Shoreline
An ADU built inside or attached to the primary residence — basement conversion, garage conversion, or bump-out addition. Lower cost; constrained by the primary footprint.
Free lookup: your lot’s zoning and setbacks, with an attached ADU placed on it to move and turn.
Permit fees in Shoreline
Set by the Shoreline fee schedule.
Shoreline fee scheduleShoreline prices an ADU's building permit on the value of the work: $397 for the first $25,000 plus $11 for each $1,000 more up to $50,000, $672 for the first $50,000 plus $9 for each $1,000 more up to $100,000, and $1,122 for the first $100,000 plus $7 for each $1,000 more up to $500,000. Plan review is 65% of that fee, plus the $6.50 state building code fee. Zoning review is billed at the $267 hourly rate with a 1-hour minimum, and civil (drainage) review, where it applies, has a 4-hour minimum, or 1 hour up to 1,000 square feet. Plumbing and mechanical permits are each $267 including 4 fixtures or pieces of equipment, and $12 for each one more. Electrical permits come from L&I, at L&I's fees. Impact fees: transportation $5,438 per ADU, or $4,622 in a high-activity area, half a detached house's; parks 50% of the principal unit's park fee or the ADU's own size bracket, whichever is less; fire $1.34 per finished square foot. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (shorelinewa.gov/
Review timeline
Typical: 30–90 business days
What Shoreline asks for with an attached ADU
Every application (18)
- Permit Application, through a Pre-Intake Record on eTRAKiT
- Mechanical / Plumbing Application and Fixture Count Worksheet
- Fire sprinkler permit, where Shoreline Fire requires one
- Site plan
- Site plan: building projections
- Site plan: rockeries, retaining walls + fences, with heights
- Site plan: paved areas, patios + walkways
- Site plan: easements + utilities
The other 10
- Site plan: parking layout + walkways
- Site plan: hardscape + building coverage
- Site plan: trees, critical root zones + tree protection
- Tree Worksheet, with the signed acknowledgment
- Arborist report, where work reaches the critical root zone of a tree to remain
- Stormwater Pollution Prevention Plan: the Handout SWPPP for a small impact project, else the Short Form or Ecology's template
- Declaration of Covenant – Stormwater Facilities, where on-site stormwater facilities are proposed
- Floor plan
- WSEC energy compliance and the selected credits, on the plans
- 2021 WSEC-R compliance form, prescriptive path (Single Family – New & Additions)
Where the lot or the work calls for it
Where the ADU adds onto the house or changes its structure
- Civil engineering plans: grading, utilities and drainage (the site plan may serve for a small addition that changes no drainage or utility service)
Where the ADU adds onto the house or changes its outside walls, windows or roof
- Typical building / wall section
- Major materials schedule
Where the work changes the outside walls, windows or roof
- Building elevations N/S/E/W
- Glazing + door schedule (NFRC U-factor / SHGC)
Each where the condition beside it holds
- Water Availability Certificate, from the water provider (more than 500 sq ft of new area, or new fixtures on North City Water District service)
- Waste Diversion Plan and Salvage Assessment (more than 1,000 sq ft built, altered or removed)
- Green building registration: Built Green 4-Star or PHIUS+ (mixed-use residential zone)
- Site plan: grading, clearing + erosion control
- Site plan: drainage facilities
- Surface water report and site development permit (2,000 sq ft or more of new and replaced hard surface)
- Geotechnical or soils report (500 cu yd of fill or excavation, slopes of 15% or more on or next to the site, or an infiltration design)
- Heating System Sizing Form (more than 750 sq ft of new area)
From the city’s own documents: City of Shoreline — Residential Addition (submittal checklist) · Shoreline Municipal Code 20.40.046, Mixed-use residential (MUR) zones · City of Shoreline — Site Plan Standards and Requirements (Updated 6/2026) and 3 more, last read October 23, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.
AADU-specific requirements
- Egress on every bedroom — IRC R310 net clear opening ≥5.7 sf; sill ≤44″ from floor.
- Smoke + CO alarms — interconnected throughout primary + AADU per IRC R314/R315.
- 1-hr separation — required between AADU and primary in some cases; otherwise a continuous draft stop.
- Independent kitchen + bath — full plumbing + cooking provision in the AADU.
- Address or unit number — the city or county assigns addresses; ask the permit center whether the unit gets its own.