ADU Permits in Shoreline

Rules for detached (DADU) and attached (AADU) accessory dwelling units in Shoreline, King County.

Free lookup. We’ll resolve your zoning, setbacks, and which ADU types are allowed on your specific parcel.

Choose an ADU type for your parcel

State law (RCW 36.70A.681) requires Shoreline to allow two ADUs on a lot in a single-family zone — one attached and one detached, two attached, or two detached — except on lots with critical areas or their buffers. An address’s own page checks its lot’s zoning.

Shoreline permit-process facts

Permit department

Submit through the Shoreline permit portal.

Permit portal

ADU permit fees

Set by the Shoreline fee schedule.

Fee schedule

Shoreline prices an ADU's building permit on the value of the work: $397 for the first $25,000 plus $11 for each $1,000 more up to $50,000, $672 for the first $50,000 plus $9 for each $1,000 more up to $100,000, and $1,122 for the first $100,000 plus $7 for each $1,000 more up to $500,000. Plan review is 65% of that fee, plus the $6.50 state building code fee. Zoning review is billed at the $267 hourly rate with a 1-hour minimum, and civil (drainage) review, where it applies, has a 4-hour minimum, or 1 hour up to 1,000 square feet. Plumbing and mechanical permits are each $267 including 4 fixtures or pieces of equipment, and $12 for each one more. Electrical permits come from L&I, at L&I's fees. Impact fees: transportation $5,438 per ADU, or $4,622 in a high-activity area, half a detached house's; parks 50% of the principal unit's park fee or the ADU's own size bracket, whichever is less; fire $1.34 per finished square foot. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account).

Review timeline

Typical: 30–90 business days

HB 1337 conformance

Shoreline permits at least two ADUs per single-family lot, with no owner-occupancy requirement and parking limits that respect the HB 1337 ceilings.

Building code: 2021 IBC w/ WA amendments · Residential: 2021 IRC w/ WA amendments · Energy (WSEC): 2021 WSEC

These are Shoreline’s ADU rules as Kolmo reads them; an address’s own page adds its setbacks, easements and critical-area buffers. Source: codepublishing.com, last verified 2026-05-17.

ADU permits in Shoreline — FAQ

Does Shoreline allow detached ADUs (DADUs)?

Yes. Washington's HB 1337 (RCW 36.70A.681) requires Shoreline to allow at least two accessory dwelling units on a lot in a single-family zone within the urban growth area, attached or detached in any combination, except on lots with critical areas or their buffers.

What is the maximum ADU size in Shoreline?

State law bars a city from setting a maximum ADU size below 1,000 sq ft of gross floor area (RCW 36.70A.681(1)(f)). Shoreline's own maximum may be higher — the per-parcel page shows it with the city's code citation.

How long does ADU permit review take in Shoreline?

Shoreline's ADU permits typically review in 30–90 business days. Pre-approved standard plans (where available) cut this further.