Detached ADU (DADU) Permits in City of Shoreline

A standalone backyard cottage with its own foundation, roof, and exterior. Maximum flexibility on layout; highest construction cost. State law bars a city maximum below 1,000 sq ft of gross floor area, except on lots with critical areas (RCW 36.70A.681).

Drops the placement canvas on your parcel for detached adu (dadu) scope. Live setback + coverage + easement checks; packet generation when you’re ready.

Permit fees in City of Shoreline

Fee schedule not yet aggregated — check the City of Shoreline fee schedule directly.

City of Shoreline fee schedule

Apply electronically via eTRAKiT (https://www.shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account). Impact fees apply at reduced ADU rates (Fire, Park, Transportation) — paid after permit review, before issuance. State Building Code Council surcharge $6.50.

Review timeline

Typical: 30–90 business days

What a DADU permit packet contains

  • A1.1 — Site plan with rotated footprint, setbacks, coverage
  • A2.1 — Floor plan with rooms, openings, egress
  • A3.1 — Elevations (all four faces, dim strings)
  • A4.1 / A4.2 — Foundation + framing plans
  • A5.1 — Wall section with WSEC R-values
  • A6.0 — Glazing schedule (NFRC U-factor + SHGC)
  • Filled application forms (city-specific)
  • Manual J energy compliance report