Detached ADU (DADU) Permits in Shoreline

A standalone backyard cottage with its own foundation, roof, and exterior. Maximum flexibility on layout; highest construction cost. State law bars a city maximum below 1,000 sq ft of gross floor area, except on lots with critical areas (RCW 36.70A.681).

Free lookup: your lot’s zoning and setbacks, with a detached ADU placed on it to move and turn.

Permit fees in Shoreline

Set by the Shoreline fee schedule.

Shoreline fee schedule

Shoreline prices an ADU's building permit on the value of the work: $397 for the first $25,000 plus $11 for each $1,000 more up to $50,000, $672 for the first $50,000 plus $9 for each $1,000 more up to $100,000, and $1,122 for the first $100,000 plus $7 for each $1,000 more up to $500,000. Plan review is 65% of that fee, plus the $6.50 state building code fee. Zoning review is billed at the $267 hourly rate with a 1-hour minimum, and civil (drainage) review, where it applies, has a 4-hour minimum, or 1 hour up to 1,000 square feet. Plumbing and mechanical permits are each $267 including 4 fixtures or pieces of equipment, and $12 for each one more. Electrical permits come from L&I, at L&I's fees. Impact fees: transportation $5,438 per ADU, or $4,622 in a high-activity area, half a detached house's; parks 50% of the principal unit's park fee or the ADU's own size bracket, whichever is less; fire $1.34 per finished square foot. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account).

Review timeline

Typical: 30–90 business days

What Shoreline asks for with a detached ADU

Every application (32)

  • Permit Application, through a Pre-Intake Record on eTRAKiT
  • Mechanical / Plumbing Application and Fixture Count Worksheet
  • Water Availability Certificate, from the water provider
  • Wastewater permit, for a new sewer connection or side sewer work
  • Fire sprinkler permit, where Shoreline Fire requires one
  • Site plan
  • Site plan: building projections
  • Site plan: rockeries, retaining walls + fences, with heights
The other 24
  • Site plan: paved areas, patios + walkways
  • Site plan: easements + utilities
  • Site plan: parking layout + walkways
  • Site plan: hardscape + building coverage
  • Site plan: trees, critical root zones + tree protection
  • Site plan: grading, clearing + erosion control
  • Site plan: drainage facilities
  • Tree Worksheet, with the signed acknowledgment
  • Arborist report, where work reaches the critical root zone of a tree to remain
  • Civil engineering plans: grading, utilities and drainage
  • Stormwater Pollution Prevention Plan: the Handout SWPPP for a small impact project, else the Short Form or Ecology's template
  • Declaration of Covenant – Stormwater Facilities, where on-site stormwater facilities are proposed
  • Foundation plan
  • Floor plan
  • Roof + floor framing plan
  • Typical building / wall section
  • Building elevations N/S/E/W
  • Glazing + door schedule (NFRC U-factor / SHGC)
  • Structural design notes (loads, materials, inspections)
  • Major materials schedule
  • Structural calculations, submitted with the application
  • Heating System Sizing Form
  • WSEC energy compliance and the selected credits, on the plans
  • 2021 WSEC-R compliance form, prescriptive path (Single Family – New & Additions)

Where the lot or the work calls for it

Where a building is taken down

  • Demolition permit for the building removed, a separate permit

Over 120 sq ft taken down

  • Asbestos survey and PSCAA Asbestos/Demolition Notification, 10 days before demolition

Each where the condition beside it holds

  • Waste Diversion Plan and Salvage Assessment (more than 1,000 sq ft built, altered or removed)
  • Green building registration: Built Green 4-Star or PHIUS+ (mixed-use residential zone)
  • Surface water report and site development permit (2,000 sq ft or more of new and replaced hard surface)
  • Geotechnical or soils report (500 cu yd of fill or excavation, slopes of 15% or more on or next to the site, or an infiltration design)

From the city’s own documents: City of Shoreline — Residential New Build (submittal checklist) · Puget Sound Clean Air Agency — Contractor Demolition · Shoreline Municipal Code 20.40.046, Mixed-use residential (MUR) zones and 3 more, last read October 24, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.