School & Educational Facility Improvements
Classroom renovations, restroom and locker room upgrades, accessibility work and phased summer construction for K-12 districts and colleges. Prevailing wage certified.
Kolmo Construction delivers facility improvements for K-12 school districts and colleges across King, Pierce and Snohomish counties — classroom and lab renovations, restroom and locker room upgrades, ADA compliance work, and security and access control rough-in. Kolmo holds WA contractor registration KOLMOL*753JS, King County SCS certification #7259 and WA State SEDBE certification #D700031098.
The defining constraint on district work is the calendar. Most projects are built into the window between the last day of school and teacher return — realistically 8 to 10 usable weeks, not the whole summer. Kolmo prices school work against that window explicitly, releases long-lead materials before the window opens where the schedule demands it, and stages work so a slipped delivery does not leave a classroom out of service in September. Scope that will not fit is phased into breaks or after-hours rather than promised into a summer it cannot fit.
Washington districts generally require background checks for contractor personnel with campus access during student occupancy, plus site-specific check-in and badging. Kolmo runs background-checked crews and works routinely under access control — the same discipline applied on the occupied Renton Police Department floor, where every crew member holds CJIS security awareness training and a passed fingerprint background check.
For public works estimated at $350,000 or less, a district may award through the small works roster process under RCW 39.04.155 rather than a formal advertised bid. Kolmo is registered on the MRSC Small Works Roster with 238 agencies selected across King, Pierce and Snohomish counties — the roster most Washington districts use — and files certified payroll direct to L&I PWIA on every prevailing wage contract.
Licensed & certified in Washington
- Washington State Contractor Registration — KOLMOL*753JS
- WA State SEDBE (Small Economically Disadvantaged Business Enterprise) — D700031098
- King County Small Contractor & Supplier (SCS) — 7259
- WA Lead-Safe RRP Firm — R25-0269
What this covers
- Summer-window and phased break scheduling
- Classroom & lab renovations
- Restroom & locker room upgrades
- ADA compliance and accessible route work
- Security & access control rough-in
- Background-checked crews for occupied campuses
- MRSC Small Works Roster — 238 agencies
- Prevailing wage & certified payroll to L&I PWIA
How the work runs
Calendar-first scope and feasibility
Kolmo starts from the actual available window — last day of school to teacher return, typically 8 to 10 usable weeks — and states plainly what fits and what does not. Scope that will not fit is phased into breaks or after-hours at proposal stage, because a district discovering in August that a classroom will not be ready has no options left.
Small works roster or bid submission
For work at or under the RCW 39.04.155 threshold Kolmo responds through the district's small works roster; above it, through the formal bid process. Either way labor is priced from current L&I prevailing wage rates by trade and county, and responsibility criteria are cleared before pricing.
Preconstruction, clearances and long-lead release
Crew background checks, badging and site access protocols are arranged before mobilization, and long-lead materials are released ahead of the window opening. Waiting until the first day of summer to order is how an 8-week window becomes a 12-week programme.
Construction inside the window
Work runs to a compressed schedule with the district's facilities team informed at agreed intervals, containment and protected routes where any part of the campus stays in use, and daily cleanup to a standard that assumes children will be in the space. Progress is documented with dated photographs against the milestone plan.
Pre-opening handover and certified payroll closeout
Spaces are handed back cleaned, inspected and punch-complete before teacher return, not before students return. Certified payroll is filed to L&I PWIA throughout, and closeout includes the Affidavit of Wages Paid, final inspections, warranties and as-built information.
School & Educational Facility Improvements — common questions
How does school construction get scheduled around the academic year?
Most district work is built into the summer window between the last day of school and teacher return — realistically 8–10 usable weeks, not the full summer. Kolmo prices school work against that window explicitly, ordering long-lead materials before the award where the schedule demands it and staging so that a slipped delivery does not put a classroom out of service in September. Work that cannot fit the window gets phased into breaks or after-hours instead of being promised into a summer it will not fit.
What clearances does a crew need to work on a school campus?
Washington districts generally require background checks for contractor personnel with access to campus during student occupancy, plus site-specific check-in and badging. Kolmo runs background-checked crews and is used to working under access control — the same discipline it applies on the occupied Renton Police Department floor, where every crew member holds CJIS security awareness training and a passed fingerprint background check.
Can a school district award work to Kolmo without a formal bid?
For public works estimated at $350,000 or less, yes — through the small works roster process under RCW 39.04.155. Kolmo is registered on the MRSC Small Works Roster with 238 agencies selected across King, Pierce and Snohomish counties, which is the roster most Washington districts use, and is King County SCS certified (#7259) and WA SEDBE certified (#D700031098) for agencies with small-business or diverse-supplier utilization goals.
Other commercial services
- Office Build-Outs & Tenant Improvements
- Retail Space Construction & Fit-Out
- Restaurant & Commercial Kitchen Renovations
- Medical & Dental Office Construction
- Industrial Facility Renovations
- ADA Compliance & Accessibility Upgrades
- Municipal & Government Facility Renovations
- Parks, Recreation & Public Space Construction