ADU Permits in City of Bellevue

Rules for detached (DADU) and attached (AADU) accessory dwelling units inCity of Bellevue, King County.

Free lookup. We’ll resolve your zoning, setbacks, and which ADU types are allowed on your specific parcel.

Choose an ADU type for your parcel

State law (RCW 36.70A.681) requires City of Bellevue to allow two ADUs on a lot in a single-family zone — one attached and one detached, two attached, or two detached — except on lots with critical areas or their buffers. The per-parcel canvas checks your specific zoning.

City of Bellevue permit-process facts

Permit department

Submit through the City of Bellevue permit portal.

Permit portal

ADU permit fees

Fee schedule not yet aggregated. Check the City of Bellevue fee schedule directly.

Fee schedule

Review timeline

Typical: 2190 business days

HB 1337 conformance

City of Bellevue permits at least two ADUs per single-family lot, with no owner-occupancy requirement and parking limits that respect the HB 1337 ceilings.

Building code: 2021 IBC w/ WA amendments · Residential: 2021 IRC w/ WA amendments · Energy (WSEC): 2021 WSEC

Rules above are aggregated from City of Bellevue’s permit-rules table; per-parcel facts (your specific setbacks, easements, ECA buffers) are pulled live on the parcel page. Primary source: https://bellevuewa.gov/ADU-reform. Last verified 2026-09-24.