ADU / DADU permits in City of Bellevue: fees, timeline & requirements (2026)

Everything you need to know about pulling a ADU / DADU permit in City of Bellevue, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Bellevue Development Services.

Permit required?
Yes — see threshold below
Permit fee
Full Construction Permit (Addition/Alteration) fees. Sewer capacity charges may apply (King County: ~$8k-$10k). Apply via https://mybuildingpermit.com.
Review timeline
21–90 days

When does a ADU / DADU need a permit in City of Bellevue?

WA HB 1337 (effective 2024) requires cities ≥6,000 pop. to allow 2 ADUs per lot in residential zones, max 1,000 sq ft, no owner-occupancy requirement, no parking requirement near transit. Local size + design caps apply.

Required submittals

  • full architectural plans
  • structural calcs
  • WSEC compliance form
  • site plan w/ setbacks
  • sewer/water capacity certification

Inspection sequence

  1. footing
  2. foundation
  3. framing
  4. rough-in (electrical/plumbing/mechanical)
  5. insulation
  6. drywall
  7. final

Contractor specialties needed

general, electrical-01-or-02, plumbing, mechanical

Notes & caveats

Bellevue allows ADU + DADU per WA HB 1337. Permit via MyBuildingPermit.com.

How to apply

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup on the main permits page — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (5).
  3. 3. Submit through the city portal: Bellevue Development Services
  4. 4. Track review (typical: 21–90 days). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Full Construction Permit (Addition/Alteration) fees. Sewer capacity charges may apply (King County: ~$8k-$10k). Apply via https://mybuildingpermit.com.) and pick up the permit. Inspection card travels with the job.
City of Bellevue resourcesPermit portal ↗Fee schedule ↗