ADU permit requirements across 17 Seattle-area cities
Side-by-side: which of Seattle, Bellevue, Kirkland, Redmond, Sammamish, Issaquah, Renton, Kent, Federal Way, Mercer Island, Shoreline, Tacoma, Lakewood, Puyallup, Everett, Lynnwood, Woodinville require a permit for an ADU or DADU, and what triggers one — each row quoted from the city's own code or permit page, with the source linked. Fees and review times appear where the city publishes them.
15 of 17 cities have authoritative rules on file · 17 always require a permit · 0 depend on the scope · 0 do not.
All 17 cities. An ADU or DADU always needs a building permit, and usually trade permits with it.
King County
| Jurisdiction | Threshold | Fee | Review days | Source |
|---|---|---|---|---|
Always | Per Bellevue ADU reform (LUC Chapter 20.20.120): ADU size limits were increased from 800 sq ft to 1,200 sq ft or 40% of the structure, whichever is larger. Owner-occupancy is no longer required. Off-street parking: no parking is required for ADUs smaller than 1,000 sq ft, or for ADUs within 1/2 mile of frequent transit; 1 space for ADUs larger than 1,000 sq ft; for ADUs larger than 2,000 sq ft, 1 space on lots smaller than 6,000 sq ft and 2 spaces on lots larger than 6,000 sq ft. | Fee: Bellevue prices an ADU's building permit on the value of the work: $728.65 for the first $25,000 plus $19.06 for each $1,000 more up to $50,000, $1,205.15 for the first $50,000 plus $12.33 for each $1,000 more up to $100,000, and $1,821.65 for the first $100,000 plus $10.77 for each $1,000 more up to $1,000,000, each prorated. Plan review is 65% of that fee and the operations fee $53 (Ordinance 6879), and the state building code fee is $6.50 on a residential permit (RCW 19.27.085). Land use, utility, transportation and clearing and grading reviews add their own fees by permit type (Ordinance 6879, Tables 13, 20, 22 and 25). The school impact fee on an ADU is half the principal unit's, and the Issaquah and Renton school districts' fees under the ordinance are $0. Bellevue issues its own electrical permits, priced on the value of the electrical work, $79 up to $500. Apply via mybuildingpermit.com. | Review: 21–90 days | Cite verified 2026-08-04 |
Always | An ADU may be up to 1,000 sq ft of floor area (and may not exceed the square footage of the primary dwelling), with up to two bedrooms, and may be up to 30 feet tall. ADUs are not permitted within required yard setbacks; a minimum 10-foot separation from other structures is required. Three off-street parking spaces are required for a property with an ADU, except within 1/4 mile of a major transit stop. | Fee: Federal Way prices an ADU's building permit on the value of the work (the ICC's building valuation data, or a bid the Building Official approves), off Valuation Table A: $1,531.67 for the first $50,000 plus $16.24 for each $1,000 more up to $100,000, and $2,343.58 for the first $100,000 plus $13.17 for each $1,000 more up to $500,000. Plan review is 65% of the building permit fee, single-family plans carry a $60 digitizing fee, and the $6.50 state building code fee and the automation fee (the greater of $43 or 5% of the permit fee) apply. The park impact fee for an ADU is $0.84 a square foot, $522 at the least and $2,624 at the most, plus the City's 5% administrative fee; the school impact fee for an ADU is $0 (2026 Fee Schedule). | Review: — | Cite verified 2026-05-29 |
Always | IMC 18.500.090: ADU max 1,000 sq ft GFA excluding non-living areas (garage, storage sheds, decks) — except when the excluded area is the location of the proposed ADU. Principal unit GFA must be ≥25% greater than largest ADU on the lot. Up to two ADUs per lot (any combination attached/detached) allowed alongside the primary residence. Owner-occupancy not required (preempted by WA HB 1337). New ADUs not subject to rear-yard setback when rear abuts a public alley (unless the city plows that alley). 4-ft walkway required from ROW/driveway to ADU primary entrance. Height per IMC 18.404 form-and-intensity for the underlying zone (typically 30 ft in SF-D / SF-S / SF-SL). Parking: one additional off-street stall required per Issaquah ADU site-plan rules (may be waived for ADUs within ½ mi of frequent transit per HB 1337). | Fee: Issaquah prices an ADU's building permit on the value of the work: $544.06 for the first $25,000 plus $14.23 for each $1,000 more up to $50,000, $895.06 for the first $50,000 plus $9.44 for each $1,000 more up to $100,000, and $1,381.06 for the first $100,000 plus $8.09 for each $1,000 more up to $500,000. Plan review adds 65% of that fee; for new construction the plumbing and mechanical permits are each 8% of the building permit fee; a 6% technology surcharge is added; and the state building code fee is $6.50. An optional pre-application meeting for an ADU is $311.29. The City's impact fee handout names ADUs among the most common exemptions from its impact fees. Where the ADU takes a new City water meter, a 3/4-inch meter carries $9,644.97 in City facilities charges, $8,852 in regional capital facilities charges and a $1,000 Cascade Water Alliance surcharge; the City's sewer general facilities charge is $4,410 per residential customer equivalent, and King County bills its sewer capacity charge separately. Electrical permits come from L&I. Apply via mybuildingpermit.com. | Review: 45–120 days | Cite verified 2026-05-16 |
Always | Two ADUs per lot are allowed (one attached + one detached, two attached, or two detached) per KCC 15.08.350. A detached ADU shall not exceed 24 feet in height. One additional parking space is required per ADU unless within 1/2 mile of a major transit stop (KCC 15.05.040). Owner-occupancy is no longer required (HB 1337). | Fee: Kent charges no separate land use fee for an ADU; it is priced with its building permit, on the value of the work: $881.32 for the first $25,000 plus $22.75 for each $1,000 more up to $50,000, $1,450.35 for the first $50,000 plus $15.78 for each $1,000 more up to $100,000, and $2,238.81 for the first $100,000 plus $12.64 for each $1,000 more up to $500,000. Intake fees are billed once the submittal is complete, and the rest before the permit issues. The plumbing and mechanical permits are priced separately, and the City's posted fee documents (its 2026 building permit fee table and land use fees) list neither, so the Permit Center (253-856-5300) quotes them. Electrical permits come from L&I, at L&I's fees. The traffic impact fee schedule the City posts (effective 2025) charges none for a lot's first ADU and $3,054.63 citywide for a second or later one. Apply through the City of Kent Permit Portal (sso.kentwa.gov). | Review: — | Cite verified 2026-05-29 |
Always | Up to two ADUs per lot, each either attached or detached. Maximum size 1,200 square feet. Owner-occupancy is not required for newly constructed ADUs (HB 1337 / RCW 36.70A.681). An ADU may be segregated in ownership from the primary dwelling, except in the Residential-L Shoreline Environment, and a DADU may be placed on its own unit lot through a unit lot subdivision. No off-street parking within one-half mile of a major transit stop; outside that, one space for the first ADU unless on-street parking is available within 600 feet or the property is within one-half mile of frequent transit. Must meet the development standards — floor area ratio, lot coverage, setbacks — that regulate the primary dwelling. Two attached ADUs need Building Code guidance from Planning and Building (425-587-3600). | Fee: Kirkland prices an ADU's building permit on the value of the work: $639 for the first $25,000 plus $17.46 for each $1,000 more up to $50,000, $1,048 for the first $50,000 plus $10.27 for each $1,000 more up to $100,000, and $1,620 for the first $100,000 plus $8.22 for each $1,000 more up to $1,000,000. Plan review is 65% of that fee, the energy code fee $101 plus 1 cent per square foot of heated or cooled space, and the state building code fee $6.50. For new construction, the plumbing and mechanical permits are each 8% of the building permit fee and the City's electrical permit 9.5%. An ADU over 800 square feet pays impact fees per square foot: park $2.59, fire $0.38 of conditioned floor area, and transportation $2.26 (July-December 2026). A separate planning review of the ADU, $634, is not required when it is reviewed with the building permit. A 3.5% technology fee is added to the City's permit and plan review fees (Kirkland Building Services Fees, 2026). Apply via mybuildingpermit.com. | Review: 217 days with plan reviewmedian, from issued permits | Cite verified 2026-05-29 |
Always | MICC 19.02.030 (interim regs implementing WA HB 1337, eff. 6/30/2024): ADU min 220 sq ft GFA, max 1,000 sq ft GFA AND capped at 25% of the parcel's allowed GFA (whichever is less). Up to 2 ADUs allowed per lot. Owner-occupancy not required (preempted by HB 1337). Setbacks: per underlying R-zone (front 20', side 5', rear 25' in R-9.6, etc.; see MICC 19.02.020(B)). Detached ADU may sit at a lot line if the lot line abuts a public alley. Parking: 1 stall/unit for lots <6,000 sq ft, 2 stalls/unit for lots ≥6,000 sq ft. Parking waived if parcel is within 1/2 mile WALKING DISTANCE of a light rail station (not generic "major transit"). Separate addressing assigned by City after Land Use approval. HB 1337 caps impact fees at 50% of SFR impact fees. | Fee: Phase A Land Use fee per MI Fee Schedule (Type II Land Use Review line). Phase B Building permit fee is valuation-based: ~$2,100 building + ~$1,365 plan review (65%) + WA BCC $6.50 + per-fixture plumbing/mech fees at $280k valuation. Impact fees (school, transportation, parks) ~$5,000-$15,000 BEFORE HB 1337's 50% ADU cap — confirm MI has updated its schedule. | Review: 30–90 days | Cite verified 2026-05-16 |
Always | Redmond's ADU rules are in RZC 21.04.1110, as amended by Ordinance 3261 (codified August 2026). Two ADUs or tiny homes are allowed on each residential lot, added to or inside the house or in a detached structure (C.1, C.2.a). An ADU may be up to 1,000 sq ft; the Administrator may allow more when it fills a whole floor of the house, or on a site over 10,000 sq ft when the ADU is an affordable housing unit or provides a public benefit (C.3.a to C.3.c). A tiny home is limited to 400 sq ft (C.3.d). A detached ADU meets the lot coverage and other standards for a detached house in its zone, but may sit right on a lot line that abuts a public alley or right-of-way (C.2.b). | Fee: Redmond prices an ADU's building permit on the value of the work: $1,285.25 for the first $50,000 plus $14.01 for each $1,000 more up to $100,000, and $1,984.02 for the first $100,000 plus $11.20 for each $1,000 more up to $500,000. Plan review is 65% of that fee, plus Planning review, $825.15 for new residential construction or $324.01 for a residential addition, and the $796.48 fire fee for residential new construction, additions and accessory structures. Electrical, mechanical and plumbing permits are separate City permits, each from a $140.71 base fee. A 4% technology surcharge applies to the total, plus the $6.50 state building code fee (2026 fee schedules). Apply through the Redmond ePermitting Service, REPS (cityofredmondwa-energovweb.tylerhost.net/ | Review: — | Cite verified 2026-11-08 |
Always | Renton allows two accessory dwelling units (attached or detached) per legal lot (RMC 4-2-110A, Ord. 6160, 6-16-2025). Onsite owner-occupancy is not required and both units may be rented (HB 1337). Renton retained a 1,000 sq ft ADU maximum; ADU follows the residential-zone development standards (e.g., 5 ft side yard). The building plan-check fee is $0 for ADUs built through Renton's Permit-Ready ADU (PRADU) program. | Fee: Renton prices an ADU's building permit on the value of the work: $1,062.23 for the first $50,000 plus $11.53 for each $1,000 more up to $100,000, and $1,638.89 for the first $100,000 plus $9.17 for each $1,000 more up to $500,000. Plan check is 65% of the permit fee, and $0 for an ADU built from the City's Permit Ready ADU (PRADU) plans, which are already reviewed; the $6.50 state building code fee applies. The storm water system development charge for an ADU is $2,350. The City adds its 5% technology surcharge to its building fees (Fee Schedule 2025-2026). Apply via permitting.rentonwa.gov. | Review: — | Cite verified 2026-05-29 |
Always | Up to two ADUs per lot are allowed (with a detached single-family residence). A detached ADU can be a maximum of 1,000 square feet; an attached ADU can be up to 50% of the size of the single-family residence or 1,000 square feet, whichever is larger. Detached ADU height is capped at 24 ft. No additional parking is required if the property already has four or more spaces. Owner-occupancy is not required (HB 1337). | Fee: Sammamish prices an ADU's building permit on the value of the work: $994.39 for the first $50,000 plus $5.68 for each $1,000 more up to $100,000, and $1,278.51 for the first $100,000 plus $8.65 for each $1,000 more up to $500,000, with plan review at 65% of the permit fee. Planning's review of the building application is $1,578 for new construction and $753 for an addition or remodel; Public Works' review of a new house or ADU in a critical area is $2,248, and its concurrency test for a house or ADU $280. The City adds a 15% technology fee to each fee (2026 Fee Schedule). Apply via mybuildingpermit.com. | Review: — | Cite verified 2026-05-29 |
Always | Max 2 ADUs per property. Pre-approved DADU plans via ADUniverse cut review to 2-6 weeks; custom designs follow standard plan submittal (SDCI Tips 103 + 106). Owner-occupancy is not required and cannot be — RCW 36.70A.681(1)(b) bars a city from requiring the owner to occupy the ADU or another unit on the lot, so both units may be rented. A covenant recorded under the old rule can be released; SDCI publishes the Release of Owner Occupancy Covenant for ADUs form for exactly that. | Fee: Where an ADU or DADU needs an SDCI permit, it is a construction permit with full plan review. SDCI prices the building permit on the value of the work through its Development Fee Index: $1,821.50 for the first $100,000, plus $7.75 for each $1,000 more to $250,000 and $7.50 per $1,000 to $500,000 ($2,984 at $250,000). With full plan review, the permit fee and the plan review fee are each 100% of the index, minimum $292; half the permit fee and all of the plan review fee are due at application. A 5% technology fee is added to every SDCI fee, and the state building code fee is $6.50 on a residential permit (SMC 22.900; RCW 19.27.085). A $250,000 DADU comes to about $6,273 before trade permits, drainage review and the side sewer permit. SDCI, not L&I, issues the electrical permit: $26.28 for each new or altered branch circuit up to 25 amps and $43.80 for 30 to 50 amps, plus a $55.48 administrative fee, minimum $105.12. Plumbing and gas piping permits come from Public Health – Seattle & King County, which sets and collects their fees. | Review: 108 days with plan reviewmedian, from issued permits | Cite verified 2026-04-26 |
Always | Max ADU floor area: 1,200 sq ft (SMC 20.40.210(C)) with shared-roof/separate-floor exception. Two ADUs per lot max (SMC 20.40.210(A)). Permit pathway: Building Permit required for both new construction and conversion-to-ADU. Garage-to-ADU conversion follows the Residential Additions checklist (per checklist scope statement) + ADU Worksheet. New detached ADU dwelling unit follows the Residential New Build checklist + ADU Worksheet. Reduced impact fees apply for ADUs (vs. primary dwelling). | Fee: Shoreline prices an ADU's building permit on the value of the work: $397 for the first $25,000 plus $11 for each $1,000 more up to $50,000, $672 for the first $50,000 plus $9 for each $1,000 more up to $100,000, and $1,122 for the first $100,000 plus $7 for each $1,000 more up to $500,000. Plan review is 65% of that fee, plus the $6.50 state building code fee. Zoning review is billed at the $267 hourly rate with a 1-hour minimum, and civil (drainage) review, where it applies, has a 4-hour minimum, or 1 hour up to 1,000 square feet. Plumbing and mechanical permits are each $267 including 4 fixtures or pieces of equipment, and $12 for each one more. Electrical permits come from L&I, at L&I's fees. Impact fees: transportation $5,438 per ADU, or $4,622 in a high-activity area, half a detached house's; parks 50% of the principal unit's park fee or the ADU's own size bracket, whichever is less; fire $1.34 per finished square foot. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (shorelinewa.gov/ | Review: 30–90 days | Cite verified 2026-05-17 |
Always | An ADU needs a building permit in Woodinville: the City's exempt list (WMC 21.62.070) names none. The City's Combined Building Permit covers the ADU's mechanical and plumbing work; the wiring needs an electrical permit from L&I, which the City does not issue. Woodinville allows up to two accessory dwelling units per lot in R-1 through R-18 (WMC 21.41.020(1)): inside the house, attached, or detached, each with 300 to 1,500 sq ft of habitable floor area (21.41.020(3)(b)). An ADU meets the zone's own setbacks, height and lot coverage, except that a detached ADU may sit on a property line along a dedicated public alley (21.41.020(3)), and a legally built garage or other enclosed structure may be converted even where it does not meet today's coverage or setbacks (21.41.020(4)(a)). The City requires 1 parking stall per ADU (Table 21.37.060), except within half a mile of a major transit stop, where state law bars any (RCW 36.70A.681). An ADU may not be rented for fewer than 30 nights (21.41.020(5)). It needs a building permit, and new construction a Woodinville Water District certificate of water and sewer availability first. Woodinville must decide a building permit within 120 days of a complete application, not counting the time it waits on the applicant (WMC 21.80.210(3)). | Fee: Woodinville values a new ADU, attached or detached, by its floor area at the rates in Table 21.62.060, $165.67 a sq ft for wood frame (Group R-3, type VB), and an ADU made from existing space on the applicant's estimate (WMC 21.62.060(1)-(2)); the building permit comes off the City's 2026 fee table, plus plan review at 65% of that fee and the $6.50 state surcharge. Plumbing and mechanical work on the Combined Building Permit adds $25 a fixture. Electrical permits come from L&I, at L&I's fees. Park, transportation and school impact fees, where they apply, are set in WMC 3.36, 3.39 and 3.38, and any water or sewer connection charge by the serving utility (Woodinville Water District for most lots), not by the City. Apply through Woodinville's online Permit Portal (aca-prod.accela.com/ | Review: — | Cite verified 2026-11-07 |
Pierce County
| Jurisdiction | Threshold | Fee | Review days | Source |
|---|---|---|---|---|
Always | WA HB 1337 (signed 2023, code-adoption deadline mid-2025) requires cities ≥6,000 pop. to permit ≥2 ADUs per lot in SF residential zones, allow ADUs of ≥1,000 sq ft (state floor — cities may allow larger, e.g. Bellevue/Redmond/Sammamish 1,200), drop owner-occupancy requirements, and waive parking requirements within ½ mi of frequent transit. City adoption status varies; local size + design caps may exceed the state floor. | Fee: Lakewood prices an ADU's building permit on the value of the work, set by the Building Official: $805 for the first $50,000 plus $9.00 for each $1,000 more up to $100,000, and $1,255 for the first $100,000 plus $7.25 for each $1,000 more up to $500,000. Plan review is 65% of the building permit fee, one hour at the least, and the $6.50 state building code fee applies; a prescriptive residential mechanical permit is $240. Every permit application carries the City's $90 administrative base fee, mechanical permits excepted, and a 4% technology fee (2026 Fee Schedule). Apply through Lakewood's Online Permit Center (app.oncamino.com/ | Review: — | Cite verified 2026-04-29 |
Always | Permit required for any new detached accessory building >200 sq ft. Sheds/outbuildings ≤200 sq ft do not require a permit. | Fee: Puyallup prices an ADU's building permit on the value of the work: $643.75 for the first $50,000 plus $7 for each $1,000 more up to $100,000, and $993.75 for the first $100,000 plus $5.60 for each $1,000 more up to $500,000, with plan review added as set in the schedule's Exhibit A. Plumbing is a separate City permit: $40 to issue, and for a one- or two-family dwelling $160 with one bathroom, $200 with two and $240 with three, or $13 for each fixture altered, with plan review at 65% of the plumbing fee. Mechanical work is $40 to issue plus unit fees, such as $19.55 a furnace up to 100,000 Btu/h and $14.10 for duct work to 1 to 5 diffusers. The electrical permit comes from L&I, at L&I's fees (2026 Municipal Fee Schedule). Apply through Puyallup's online permit system, CityView (permits.puyallupwa.gov/ | Review: — | Cite verified 2026-04-29 |
Always | Two ADUs per lot allowed (any lot size/width in residentially-zoned districts). Living area limited to 1,000 sq ft (excluding non-living areas). Detached ADU setbacks: 5ft side property line (8ft if main entrance faces side), 15ft rear property line (no setback from alleys). Subject to standard zone height limits. | Fee: Tacoma's ADU land use permit is $1,330 (Table 4). The building permit is a combination building, mechanical and plumbing permit (Table 8-4): 1.31% of the ICC building valuation for new construction, or 2.81% for an ADU built as an addition, with plan review at 45% of that fee, and a site development permit (grading and erosion control) at 65% of the building permit fee with its own plan review at 45%. Table 1 adds the technology (5%), emergency preparedness (5%) and reserve fund (2%) surcharges, and the natural resources program (5%) on building permits. Apply via aca-prod.accela.com/ | Review: 21–60 days | Cite verified 2026-04-29 |
Snohomish County
| Jurisdiction | Threshold | Fee | Review days | Source |
|---|---|---|---|---|
Always | WA HB 1337 (signed 2023, code-adoption deadline mid-2025) requires cities ≥6,000 pop. to permit ≥2 ADUs per lot in SF residential zones, allow ADUs of ≥1,000 sq ft (state floor — cities may allow larger, e.g. Bellevue/Redmond/Sammamish 1,200), drop owner-occupancy requirements, and waive parking requirements within ½ mi of frequent transit. City adoption status varies; local size + design caps may exceed the state floor. | Fee: Everett sets an ADU's valuation at $193 a square foot and prices the building permit on it: $818.75 plus $21.75 for each $1,000 over $25,000 up to $50,000, $1,362.50 plus $20.75 for each $1,000 over $50,000 up to $100,000, and $2,400 plus $8.75 for each $1,000 over $100,000 up to $500,000. Plan review adds 75% of that fee and Planning's review 10%, plus the $6.50 state building code fee. For a new dwelling unit the mechanical permit is the $130 base fee plus $60 for up to 1,000 square feet of conditioned floor space or $90 up to 2,000; plumbing is $130 plus $20 for each fixture; and the City's electrical permit is $100 under 1,000 square feet or $150 up to 2,000. The transportation impact fee for an ADU is $3,115, but a net increase of one ADU triggers none; ADUs pay no school impact fee; the parks impact fee ($1,133 for a studio or one bedroom, $2,268 for two, $3,401 for three or more) is halved for one or two ADUs added to a lot whose house stays. Where the ADU takes a new 3/4-inch City water meter, water and sewer system development fees are $9,433 ($5,159 water, $4,274 sewer), and new impervious area pays $0.3624 a square foot in stormwater system development fees. | Review: 30–90 days | Cite verified 2026-09-07 |
Always | WA HB 1337 (signed 2023, code-adoption deadline mid-2025) requires cities ≥6,000 pop. to permit ≥2 ADUs per lot in SF residential zones, allow ADUs of ≥1,000 sq ft (state floor — cities may allow larger, e.g. Bellevue/Redmond/Sammamish 1,200), drop owner-occupancy requirements, and waive parking requirements within ½ mi of frequent transit. City adoption status varies; local size + design caps may exceed the state floor. | Fee: Lynnwood prices an ADU's building permit on the value of the work, by the ICC valuation table or the square footage, whichever is greater: $1,181.86 for the first $50,000 plus $12.62 for each $1,000 more up to $100,000, and $1,812.71 for the first $100,000 plus $10.32 for each $1,000 more up to $500,000. Plan review is 65% of that fee. For new construction, the plumbing and mechanical permits are each 10% of the building permit fee; in an addition they are $257 for up to 4 fixtures or pieces of equipment and $22 for each one more. The City issues the electrical permit, priced for new construction on its electrical valuation table, $114 up to $1,000. A 2.5% technology fee is added (LMC 3.104). | Review: — | Cite verified 2026-09-07 |
How this table is built
Each row reflects the most-recently-verified authoritative rule on file for that jurisdiction and project type. A row shows a fee where the city publishes one; every building permit in Washington also carries the State Building Code Council's $6.50 surcharge. Sources link directly to the city or county page we read on the verified-on date. See our data-quality leaderboard for how we keep these current.